fix: isolate review-mutation ledger from host session-state (Closes #590) #592

Merged
sysadmin merged 2 commits from fix/issue-590-ledger-isolation into master 2026-07-09 16:32:03 -05:00
Owner

Summary

Fixes flaky TestMergePR.test_unknown_profile_blocks on clean master by isolating the durable review-mutation ledger from operator host session-state.

Root cause

Many tests use patch.dict(os.environ, ..., clear=True). That dropped GITEA_MCP_SESSION_STATE_DIR set by tests/conftest.py, so _load_review_decision_lock fell back to ~/.cache/gitea-tools/session-state. A residual request_changes mutation then triggered the #332 terminal hard-stop before the empty-profile eligibility gate, so the test asserted the wrong reason.

TestMergePR.setUp also calls gitea_load_review_workflow(), which makes the hard-stop path reachable (workflow gate passes).

Fix

  1. conftest — pin mcp_session_state.default_state_dir / DEFAULT_STATE_DIR to a per-test temp dir so env clears cannot re-expose host cache; still honor an explicit GITEA_MCP_SESSION_STATE_DIR when a test sets its own.
  2. TestMergePR.setUp — clear the decision lock at the start of each merge test.
  3. Regressiontest_env_clear_does_not_adopt_host_review_mutation_ledger plus tests/test_session_state_isolation.py.

Validation

pytest tests/test_mcp_server.py::TestMergePR -q
pytest tests/test_mcp_server.py -q   # 207 passed
pytest tests/test_session_state_isolation.py tests/test_mcp_session_state.py \
  tests/test_terminal_review_hard_stop.py tests/test_review_workflow_load.py -q

Closes #590

## Summary Fixes flaky `TestMergePR.test_unknown_profile_blocks` on clean master by isolating the durable review-mutation ledger from operator host session-state. ### Root cause Many tests use `patch.dict(os.environ, ..., clear=True)`. That dropped `GITEA_MCP_SESSION_STATE_DIR` set by `tests/conftest.py`, so `_load_review_decision_lock` fell back to `~/.cache/gitea-tools/session-state`. A residual `request_changes` mutation then triggered the #332 terminal hard-stop *before* the empty-profile eligibility gate, so the test asserted the wrong reason. `TestMergePR.setUp` also calls `gitea_load_review_workflow()`, which makes the hard-stop path reachable (workflow gate passes). ### Fix 1. **conftest** — pin `mcp_session_state.default_state_dir` / `DEFAULT_STATE_DIR` to a per-test temp dir so env clears cannot re-expose host cache; still honor an explicit `GITEA_MCP_SESSION_STATE_DIR` when a test sets its own. 2. **TestMergePR.setUp** — clear the decision lock at the start of each merge test. 3. **Regression** — `test_env_clear_does_not_adopt_host_review_mutation_ledger` plus `tests/test_session_state_isolation.py`. ### Validation ``` pytest tests/test_mcp_server.py::TestMergePR -q pytest tests/test_mcp_server.py -q # 207 passed pytest tests/test_session_state_isolation.py tests/test_mcp_session_state.py \ tests/test_terminal_review_hard_stop.py tests/test_review_workflow_load.py -q ``` Closes #590
jcwalker3 force-pushed fix/issue-590-ledger-isolation from 0d8b000b10 to 5fae0ae4e7 2026-07-09 13:23:23 -05:00 Compare
Owner

repo: Scaled-Tech-Consulting/Gitea-Tools
pr: #592
issue: #590
reviewer_identity: sysadmin
profile: prgs-reviewer
session_id: 40160-636d5991026e
worktree: /Users/jasonwalker/Development/Gitea-Tools/branches/review-pr-592-issue-590
phase: claimed
candidate_head: b810e512fd
target_branch: master
target_branch_sha: none
last_activity: 2026-07-09T18:59:56Z
expires_at: 2026-07-09T20:59:56Z
blocker: none

<!-- mcp-review-lease:v1 --> repo: Scaled-Tech-Consulting/Gitea-Tools pr: #592 issue: #590 reviewer_identity: sysadmin profile: prgs-reviewer session_id: 40160-636d5991026e worktree: /Users/jasonwalker/Development/Gitea-Tools/branches/review-pr-592-issue-590 phase: claimed candidate_head: b810e512fd9f50b7c0106305914ad79553faee12 target_branch: master target_branch_sha: none last_activity: 2026-07-09T18:59:56Z expires_at: 2026-07-09T20:59:56Z blocker: none
Owner

Canonical Issue State

STATE:
blocked

WHO_IS_NEXT:
user

NEXT_ACTION:
Clear the stale prgs-reviewer #332 durable review-mutation ledger left from merged PR #586, then re-run formal APPROVE on PR #592 at head b810e512fd.

NEXT_PROMPT:

Operator unblock then reviewer re-attempt for Scaled-Tech-Consulting/Gitea-Tools PR #592 (Issue #590).

1) Confirm durable session-state review_decision_lock-prgs-reviewer.json still lists terminal approve live_mutations ending in PR #586 (already merged at 6913ac9).
2) Clear that stale terminal ledger via supported operator procedure (no hand-bypass of production guards).
3) Restart gitea-reviewer MCP if required for clean session state.
4) Re-run independent formal review APPROVE for PR #592 head b810e512fd9f50b7c0106305914ad79553faee12 using prgs-reviewer only.

Technical review already completed green in branches/review-pr-592-issue-590; formal gitea_mark_final_review_decision was blocked by #332, not by code findings.

WHAT_HAPPENED:
Independent technical review of PR #592 completed in isolated worktree branches/review-pr-592-issue-590. Validation green (207 mcp_server tests + isolation/hard-stop suites). Formal APPROVE blocked: gitea_mark_final_review_decision fail-closed under #332 because durable prgs-reviewer ledger still records terminal approve on already-merged PR #586.

WHY:
#332 hard-stop is working as designed for a live run, but the durable session-state ledger (#559) retained terminal mutations after #586 merged, so a new independent PR review cannot mark/submit APPROVE. PR #592 code itself is scoped and tested; this is a tooling/session-state blocker, not a code rejection.

RELATED_DISCUSSION:
none

RELATED_PRS:

  • #592 (this PR, Issue #590)
  • #586 (merged; last terminal approve in durable ledger)
  • #589, #585 (prior terminal approves also present in same ledger)

BRANCH:
fix/issue-590-ledger-isolation

HEAD_SHA:
b810e512fd

VALIDATION:

  • Identity: sysadmin / prgs-reviewer; PR author jcwalker3; self_author=false; approve eligible
  • Scope files only: tests/conftest.py, tests/test_mcp_server.py, tests/test_session_state_isolation.py
  • git diff --check prgs/master...HEAD: clean
  • pytest tests/test_mcp_server.py -q: 207 passed
  • pytest tests/test_session_state_isolation.py tests/test_mcp_session_state.py tests/test_terminal_review_hard_stop.py tests/test_review_workflow_load.py -q: 32 passed
  • key regressions: 4 passed
  • gitea_dry_run_pr_review APPROVE: would_perform=true
  • gitea_mark_final_review_decision: blocked (#332 approve on #586)
  • No formal review ID submitted

BLOCKERS:
Durable #332 terminal ledger for prgs-reviewer still ends with approve on merged PR #586, blocking mark-ready/submit for any other PR. Unblock condition: clear/reset review_decision_lock-prgs-reviewer via supported operator path, then re-run formal review of #592.

LAST_UPDATED_BY:
sysadmin / prgs-reviewer / 2026-07-09


Technical review notes (informal; not a formal verdict)

Intended formal decision once unblocked: APPROVE

Isolation inspection (all pass for code change):

  1. Per-test session-state isolation pins DEFAULT_STATE_DIR + default_state_dir so patch.dict(clear=True) cannot re-adopt host ~/.cache/gitea-tools/session-state.
  2. Explicit GITEA_MCP_SESSION_STATE_DIR override still honored.
  3. TestMergePR.setUp clears decision lock each test.
  4. Regression test_env_clear_does_not_adopt_host_review_mutation_ledger + test_session_state_isolation.py cover the failure mode.
  5. Stale-runtime probe stubbed only under tests; production #332 hard-stop path unchanged (no non-test files in diff).

Review decision: BLOCKED + DIAGNOSE (tooling/session). No formal review/comment ID from gitea_submit_pr_review.
Lease comment_id: 8454

## Canonical Issue State STATE: blocked WHO_IS_NEXT: user NEXT_ACTION: Clear the stale prgs-reviewer #332 durable review-mutation ledger left from merged PR #586, then re-run formal APPROVE on PR #592 at head b810e512fd9f50b7c0106305914ad79553faee12. NEXT_PROMPT: ```text Operator unblock then reviewer re-attempt for Scaled-Tech-Consulting/Gitea-Tools PR #592 (Issue #590). 1) Confirm durable session-state review_decision_lock-prgs-reviewer.json still lists terminal approve live_mutations ending in PR #586 (already merged at 6913ac9). 2) Clear that stale terminal ledger via supported operator procedure (no hand-bypass of production guards). 3) Restart gitea-reviewer MCP if required for clean session state. 4) Re-run independent formal review APPROVE for PR #592 head b810e512fd9f50b7c0106305914ad79553faee12 using prgs-reviewer only. Technical review already completed green in branches/review-pr-592-issue-590; formal gitea_mark_final_review_decision was blocked by #332, not by code findings. ``` WHAT_HAPPENED: Independent technical review of PR #592 completed in isolated worktree branches/review-pr-592-issue-590. Validation green (207 mcp_server tests + isolation/hard-stop suites). Formal APPROVE blocked: gitea_mark_final_review_decision fail-closed under #332 because durable prgs-reviewer ledger still records terminal approve on already-merged PR #586. WHY: #332 hard-stop is working as designed for a live run, but the durable session-state ledger (#559) retained terminal mutations after #586 merged, so a new independent PR review cannot mark/submit APPROVE. PR #592 code itself is scoped and tested; this is a tooling/session-state blocker, not a code rejection. RELATED_DISCUSSION: none RELATED_PRS: - #592 (this PR, Issue #590) - #586 (merged; last terminal approve in durable ledger) - #589, #585 (prior terminal approves also present in same ledger) BRANCH: fix/issue-590-ledger-isolation HEAD_SHA: b810e512fd9f50b7c0106305914ad79553faee12 VALIDATION: - Identity: sysadmin / prgs-reviewer; PR author jcwalker3; self_author=false; approve eligible - Scope files only: tests/conftest.py, tests/test_mcp_server.py, tests/test_session_state_isolation.py - git diff --check prgs/master...HEAD: clean - pytest tests/test_mcp_server.py -q: 207 passed - pytest tests/test_session_state_isolation.py tests/test_mcp_session_state.py tests/test_terminal_review_hard_stop.py tests/test_review_workflow_load.py -q: 32 passed - key regressions: 4 passed - gitea_dry_run_pr_review APPROVE: would_perform=true - gitea_mark_final_review_decision: blocked (#332 approve on #586) - No formal review ID submitted BLOCKERS: Durable #332 terminal ledger for prgs-reviewer still ends with approve on merged PR #586, blocking mark-ready/submit for any other PR. Unblock condition: clear/reset review_decision_lock-prgs-reviewer via supported operator path, then re-run formal review of #592. LAST_UPDATED_BY: sysadmin / prgs-reviewer / 2026-07-09 --- ### Technical review notes (informal; not a formal verdict) **Intended formal decision once unblocked:** APPROVE **Isolation inspection (all pass for code change):** 1. Per-test session-state isolation pins DEFAULT_STATE_DIR + default_state_dir so patch.dict(clear=True) cannot re-adopt host ~/.cache/gitea-tools/session-state. 2. Explicit GITEA_MCP_SESSION_STATE_DIR override still honored. 3. TestMergePR.setUp clears decision lock each test. 4. Regression test_env_clear_does_not_adopt_host_review_mutation_ledger + test_session_state_isolation.py cover the failure mode. 5. Stale-runtime probe stubbed only under tests; production #332 hard-stop path unchanged (no non-test files in diff). **Review decision:** BLOCKED + DIAGNOSE (tooling/session). No formal review/comment ID from gitea_submit_pr_review. **Lease comment_id:** 8454
Owner

repo: Scaled-Tech-Consulting/Gitea-Tools
pr: #592
issue: #590
reviewer_identity: sysadmin
profile: prgs-reviewer
session_id: 40160-636d5991026e
worktree: /Users/jasonwalker/Development/Gitea-Tools/branches/review-pr-592-issue-590
phase: released
candidate_head: b810e512fd
target_branch: master
target_branch_sha: none
last_activity: 2026-07-09T19:04:23Z
expires_at: 2026-07-09T21:04:23Z
blocker: manual-release

<!-- mcp-review-lease:v1 --> repo: Scaled-Tech-Consulting/Gitea-Tools pr: #592 issue: #590 reviewer_identity: sysadmin profile: prgs-reviewer session_id: 40160-636d5991026e worktree: /Users/jasonwalker/Development/Gitea-Tools/branches/review-pr-592-issue-590 phase: released candidate_head: b810e512fd9f50b7c0106305914ad79553faee12 target_branch: master target_branch_sha: none last_activity: 2026-07-09T19:04:23Z expires_at: 2026-07-09T21:04:23Z blocker: manual-release
Owner

Canonical Issue State

STATE: BLOCKED
WHO_IS_NEXT: user
NEXT_ACTION: Clear durable review_decision_lock for prgs-reviewer (or restart that MCP profile with a clean session-state dir), then re-run formal APPROVE submit for PR #592 at head b810e512fd.
NEXT_PROMPT:

Gitea reviewer task. Invoke gitea-workflow first.

Resume formal review of Scaled-Tech-Consulting/Gitea-Tools PR #592 for Issue #590 after clearing the durable #332 review_decision_lock for profile prgs-reviewer (prior terminal approve on PR #586 blocked mark_final_review_decision).

Live head to pin: b810e512fd9f50b7c0106305914ad79553faee12
Use branches/review-pr-592-issue-590 worktree (or a fresh isolated branches/ reviewer worktree at that head).
Do not mutate root checkout. Do not merge. Do not use raw API/curl/bypasses.

Technical review already completed (tests green, scope OK, production #332 intact). Submit formal APPROVE via gitea_mark_final_review_decision + gitea_submit_pr_review with expected_head_sha pinned.

WHAT_HAPPENED: Independent reviewer (sysadmin / prgs-reviewer, not author jcwalker3) fully re-validated PR #592 at live head b810e512fd. Code is merge-ready (tests-only isolation fix for #590). Formal mark/submit failed closed under #332 because durable host session-state still records terminal approve mutations for PRs #589/#585/#586 under review_decision_lock-prgs-reviewer.json.
WHY: #332 forbids additional terminal review mutations after a terminal live review in the same durable session; #559 persists that lock across daemon processes under ~/.cache/gitea-tools/session-state. This is an operator tooling/session gate, not a defect in the PR #592 patch.
RELATED_PRS: #592 (this PR), #586 (last terminal approve in durable lock), #585, #589 (prior terminal mutations in same lock), #590 (linked issue)
BLOCKERS: UNBLOCK when durable file ~/.cache/gitea-tools/session-state/review_decision_lock-prgs-reviewer.json no longer contains a terminal live_mutations entry that hard-stops mark_ready for a different PR (e.g. operator removes or resets that lock / restarts prgs-reviewer with a clean GITEA_MCP_SESSION_STATE_DIR). Currently blocked because live_mutations ends with approve on PR #586 so gitea_mark_final_review_decision for PR #592 fail-closes under #332.
VALIDATION:

  • Identity: sysadmin / prgs-reviewer; self_author=false; approve/review eligible
  • PR open + mergeable=true at b810e512fd
  • Files: tests/conftest.py, tests/test_mcp_server.py, tests/test_session_state_isolation.py only (0 production files)
  • git diff --check prgs/master...HEAD: clean
  • pytest tests/test_mcp_server.py -q: 207 passed
  • pytest isolation/session/hard-stop related: 33 passed
  • Provisional technical verdict: would APPROVE if formal path free
    LAST_UPDATED_BY: sysadmin (prgs-reviewer)

Implementation inspection summary

Check Result
Per-test session-state isolation Pass
patch.dict clear=True does not adopt host ~/.cache session-state Pass
Stale-runtime probes isolated in pytest Pass
Review decision lock reset between merge tests Pass
Production #332 hard-stop not weakened Pass (tests-only)
## Canonical Issue State STATE: BLOCKED WHO_IS_NEXT: user NEXT_ACTION: Clear durable review_decision_lock for prgs-reviewer (or restart that MCP profile with a clean session-state dir), then re-run formal APPROVE submit for PR #592 at head b810e512fd9f50b7c0106305914ad79553faee12. NEXT_PROMPT: ```text Gitea reviewer task. Invoke gitea-workflow first. Resume formal review of Scaled-Tech-Consulting/Gitea-Tools PR #592 for Issue #590 after clearing the durable #332 review_decision_lock for profile prgs-reviewer (prior terminal approve on PR #586 blocked mark_final_review_decision). Live head to pin: b810e512fd9f50b7c0106305914ad79553faee12 Use branches/review-pr-592-issue-590 worktree (or a fresh isolated branches/ reviewer worktree at that head). Do not mutate root checkout. Do not merge. Do not use raw API/curl/bypasses. Technical review already completed (tests green, scope OK, production #332 intact). Submit formal APPROVE via gitea_mark_final_review_decision + gitea_submit_pr_review with expected_head_sha pinned. ``` WHAT_HAPPENED: Independent reviewer (sysadmin / prgs-reviewer, not author jcwalker3) fully re-validated PR #592 at live head b810e512fd9f50b7c0106305914ad79553faee12. Code is merge-ready (tests-only isolation fix for #590). Formal mark/submit failed closed under #332 because durable host session-state still records terminal approve mutations for PRs #589/#585/#586 under review_decision_lock-prgs-reviewer.json. WHY: #332 forbids additional terminal review mutations after a terminal live review in the same durable session; #559 persists that lock across daemon processes under ~/.cache/gitea-tools/session-state. This is an operator tooling/session gate, not a defect in the PR #592 patch. RELATED_PRS: #592 (this PR), #586 (last terminal approve in durable lock), #585, #589 (prior terminal mutations in same lock), #590 (linked issue) BLOCKERS: UNBLOCK when durable file ~/.cache/gitea-tools/session-state/review_decision_lock-prgs-reviewer.json no longer contains a terminal live_mutations entry that hard-stops mark_ready for a different PR (e.g. operator removes or resets that lock / restarts prgs-reviewer with a clean GITEA_MCP_SESSION_STATE_DIR). Currently blocked because live_mutations ends with approve on PR #586 so gitea_mark_final_review_decision for PR #592 fail-closes under #332. VALIDATION: - Identity: sysadmin / prgs-reviewer; self_author=false; approve/review eligible - PR open + mergeable=true at b810e512fd9f50b7c0106305914ad79553faee12 - Files: tests/conftest.py, tests/test_mcp_server.py, tests/test_session_state_isolation.py only (0 production files) - git diff --check prgs/master...HEAD: clean - pytest tests/test_mcp_server.py -q: 207 passed - pytest isolation/session/hard-stop related: 33 passed - Provisional technical verdict: would APPROVE if formal path free LAST_UPDATED_BY: sysadmin (prgs-reviewer) ### Implementation inspection summary | Check | Result | |---|---| | Per-test session-state isolation | Pass | | patch.dict clear=True does not adopt host ~/.cache session-state | Pass | | Stale-runtime probes isolated in pytest | Pass | | Review decision lock reset between merge tests | Pass | | Production #332 hard-stop not weakened | Pass (tests-only) |
Owner

Canonical Issue State

STATE: BLOCKED
WHO_IS_NEXT: user
NEXT_ACTION: Advance the operator root Gitea-Tools checkout to prgs/master at ac531dda05 (PR #595 merge) and fully restart/reconnect the gitea-reviewer MCP so gitea_cleanup_stale_review_decision_lock is loaded; then re-run formal APPROVE of PR #592 at head b810e512fd.
NEXT_PROMPT:

Gitea reviewer task. Invoke gitea-workflow first.

Retry formal APPROVE of Scaled-Tech-Consulting/Gitea-Tools PR #592 for Issue #590.

Prerequisite (must pass first):
- gitea-reviewer whoami is sysadmin / prgs-reviewer
- MCP runtime source is current master containing PR #595 merge ac531dda05858d17360aab17744e1a489e7d0aba
- gitea_cleanup_stale_review_decision_lock is available in gitea-reviewer tools

If #332 still blocks, assess then apply cleanup with expected_terminal_pr=586, remote=prgs, org=Scaled-Tech-Consulting, repo=Gitea-Tools.
Then load workflow, acquire lease, mark final APPROVE, submit formal APPROVE at head b810e512fd9f50b7c0106305914ad79553faee12.
Do not merge. Do not mutate root during the review task itself (operator must update root before restart). Stay out of Timesheet.

WHAT_HAPPENED: Formal APPROVE retry for PR #592 was attempted after #595 landed. Reviewer identity is correct (sysadmin / prgs-reviewer). PR #592 remains open at expected head b810e512fd (self_author=false, approve eligible). Formal path STOPPED at prerequisite #2: live gitea-reviewer MCP still executes from root HEAD 6913ac98f1 (pre-#595). Tool search does not expose gitea_cleanup_stale_review_decision_lock (only gitea_cleanup_stale_claims). Root lacks stale_review_decision_lock.py; module exists on detached master worktree branches/merge-pr-595-issue-594 @ ac531dd.
WHY: Prerequisite requires MCP on master including #595 so canonical stale-lock cleanup is available. Restart alone is insufficient while the MCP entrypoint path points at a root checkout still behind prgs/master. Reviewer task is forbidden from mutating root; operator must fast-forward root then restart MCP.
RELATED_PRS: #592 (this PR), #590 (issue), #595 (landed cleanup tool; merge ac531dda05)
BLOCKERS: UNBLOCK when (1) root Gitea-Tools HEAD is ac531dda05 or later containing #595, AND (2) gitea-reviewer MCP fully restarted so ToolSearch exposes gitea_cleanup_stale_review_decision_lock. Note: PR #592 is currently mergeable=false after master advanced — formal approve may still target current head, but merger will need rebase/restack separately.
VALIDATION:

  • whoami: sysadmin / prgs-reviewer
  • PR open at b810e512fd9f50b7c0106305914ad79553faee12; no formal reviews yet
  • cleanup tool availability: FAIL (not in MCP tool catalog)
  • root_has_595: no; root_module: no; wt_module @ ac531dd: yes
  • formal APPROVE: not attempted (prerequisite fail-closed)
    LAST_UPDATED_BY: sysadmin (prgs-reviewer)
## Canonical Issue State STATE: BLOCKED WHO_IS_NEXT: user NEXT_ACTION: Advance the operator root Gitea-Tools checkout to prgs/master at ac531dda05858d17360aab17744e1a489e7d0aba (PR #595 merge) and fully restart/reconnect the gitea-reviewer MCP so gitea_cleanup_stale_review_decision_lock is loaded; then re-run formal APPROVE of PR #592 at head b810e512fd9f50b7c0106305914ad79553faee12. NEXT_PROMPT: ```text Gitea reviewer task. Invoke gitea-workflow first. Retry formal APPROVE of Scaled-Tech-Consulting/Gitea-Tools PR #592 for Issue #590. Prerequisite (must pass first): - gitea-reviewer whoami is sysadmin / prgs-reviewer - MCP runtime source is current master containing PR #595 merge ac531dda05858d17360aab17744e1a489e7d0aba - gitea_cleanup_stale_review_decision_lock is available in gitea-reviewer tools If #332 still blocks, assess then apply cleanup with expected_terminal_pr=586, remote=prgs, org=Scaled-Tech-Consulting, repo=Gitea-Tools. Then load workflow, acquire lease, mark final APPROVE, submit formal APPROVE at head b810e512fd9f50b7c0106305914ad79553faee12. Do not merge. Do not mutate root during the review task itself (operator must update root before restart). Stay out of Timesheet. ``` WHAT_HAPPENED: Formal APPROVE retry for PR #592 was attempted after #595 landed. Reviewer identity is correct (sysadmin / prgs-reviewer). PR #592 remains open at expected head b810e512fd9f50b7c0106305914ad79553faee12 (self_author=false, approve eligible). Formal path STOPPED at prerequisite #2: live gitea-reviewer MCP still executes from root HEAD 6913ac98f13edf47109c46cbfb573184f2505720 (pre-#595). Tool search does not expose gitea_cleanup_stale_review_decision_lock (only gitea_cleanup_stale_claims). Root lacks stale_review_decision_lock.py; module exists on detached master worktree branches/merge-pr-595-issue-594 @ ac531dd. WHY: Prerequisite requires MCP on master including #595 so canonical stale-lock cleanup is available. Restart alone is insufficient while the MCP entrypoint path points at a root checkout still behind prgs/master. Reviewer task is forbidden from mutating root; operator must fast-forward root then restart MCP. RELATED_PRS: #592 (this PR), #590 (issue), #595 (landed cleanup tool; merge ac531dda05858d17360aab17744e1a489e7d0aba) BLOCKERS: UNBLOCK when (1) root Gitea-Tools HEAD is ac531dda05858d17360aab17744e1a489e7d0aba or later containing #595, AND (2) gitea-reviewer MCP fully restarted so ToolSearch exposes gitea_cleanup_stale_review_decision_lock. Note: PR #592 is currently mergeable=false after master advanced — formal approve may still target current head, but merger will need rebase/restack separately. VALIDATION: - whoami: sysadmin / prgs-reviewer - PR open at b810e512fd9f50b7c0106305914ad79553faee12; no formal reviews yet - cleanup tool availability: FAIL (not in MCP tool catalog) - root_has_595: no; root_module: no; wt_module @ ac531dd: yes - formal APPROVE: not attempted (prerequisite fail-closed) LAST_UPDATED_BY: sysadmin (prgs-reviewer)
Owner

repo: Scaled-Tech-Consulting/Gitea-Tools
pr: #592
issue: #590
reviewer_identity: sysadmin
profile: prgs-reviewer
session_id: 21268-dedcc138837f
worktree: /Users/jasonwalker/Development/Gitea-Tools/branches/review-pr-538
phase: claimed
candidate_head: b810e512fd
target_branch: master
target_branch_sha: none
last_activity: 2026-07-09T20:11:04Z
expires_at: 2026-07-09T22:11:04Z
blocker: none

<!-- mcp-review-lease:v1 --> repo: Scaled-Tech-Consulting/Gitea-Tools pr: #592 issue: #590 reviewer_identity: sysadmin profile: prgs-reviewer session_id: 21268-dedcc138837f worktree: /Users/jasonwalker/Development/Gitea-Tools/branches/review-pr-538 phase: claimed candidate_head: b810e512fd9f50b7c0106305914ad79553faee12 target_branch: master target_branch_sha: none last_activity: 2026-07-09T20:11:04Z expires_at: 2026-07-09T22:11:04Z blocker: none
Owner

repo: Scaled-Tech-Consulting/Gitea-Tools
pr: #592
issue: #590
reviewer_identity: sysadmin
profile: prgs-reviewer
session_id: 21268-dedcc138837f
worktree: /Users/jasonwalker/Development/Gitea-Tools/branches/review-pr-538
phase: released
candidate_head: b810e512fd
target_branch: master
target_branch_sha: none
last_activity: 2026-07-09T20:13:09Z
expires_at: 2026-07-09T22:13:09Z
blocker: manual-release

<!-- mcp-review-lease:v1 --> repo: Scaled-Tech-Consulting/Gitea-Tools pr: #592 issue: #590 reviewer_identity: sysadmin profile: prgs-reviewer session_id: 21268-dedcc138837f worktree: /Users/jasonwalker/Development/Gitea-Tools/branches/review-pr-538 phase: released candidate_head: b810e512fd9f50b7c0106305914ad79553faee12 target_branch: master target_branch_sha: none last_activity: 2026-07-09T20:13:09Z expires_at: 2026-07-09T22:13:09Z blocker: manual-release
Owner

Canonical Issue State

STATE: blocked — formal APPROVE retry of PR #592 cannot proceed because live gitea-reviewer still runs pre-#595 code and lacks gitea_cleanup_stale_review_decision_lock
WHO_IS_NEXT: user
NEXT_ACTION: Fast-forward root checkout to prgs/master at ac531dd or later, fully restart/reconnect gitea-reviewer from that code, verify cleanup tool is registered, then re-run formal APPROVE of PR #592 at head b810e512fd
NEXT_PROMPT:

Gitea reviewer task. Invoke gitea-workflow first.
Retry formal review of PR #592 after root checkout is on prgs/master containing ac531dd and gitea-reviewer MCP has been fully restarted.
Prerequisites: gitea_whoami(remote=prgs)=sysadmin/prgs-reviewer; gitea_cleanup_stale_review_decision_lock available.
Target: PR #592 / Issue #590 / head b810e512fd9f50b7c0106305914ad79553faee12 / APPROVE.
If #332 stale decision lock blocks, dry-run then apply gitea_cleanup_stale_review_decision_lock(expected_terminal_pr=586, remote=prgs, org=Scaled-Tech-Consulting, repo=Gitea-Tools).
Load workflow, acquire lease, mark final APPROVE, submit formal APPROVE. Do not merge. Isolated worktree under branches/.

WHAT_HAPPENED: Identity OK (sysadmin/prgs-reviewer). PR #592 open at expected head b810e512fd (mergeable=false). PR #595 is on prgs/master (ac531dd) but root control checkout remains at 6913ac9 (4 commits behind). Live MCP tool catalog does not include gitea_cleanup_stale_review_decision_lock. Formal lease/mark/submit not attempted.
WHY: MCP processes load root mcp_server.py from behind-master checkout; #595 cleanup tool exists only at/after ac531dd. Cannot use manual session-state deletion. Root-guard (#475) also blocks mutations until control checkout matches prgs/master unless operating from a branches/ worktree.
RELATED_PRS: #592 (this PR), #595 (landed cleanup tool, closes #594), #593 (open auto-restart MCP, #591), #586 (prior terminal PR referenced by stale #332 lock history)
BLOCKERS: live gitea-reviewer runtime missing #595 tool surface; root HEAD behind prgs/master; possible residual #332 lock for PR #586 once runtime is current; live mergeable=false for #592
VALIDATION: gitea_whoami remote=prgs -> sysadmin/prgs-reviewer; gitea_list_prs head_sha=b810e512; search_tool miss for cleanup tool; disk proof cleanup tool absent on root, present in branches/reviewer-pr592-retry@ac531dd
LAST_UPDATED_BY: prgs-reviewer (sysadmin) formal-review retry session 2026-07-09

## Canonical Issue State STATE: blocked — formal APPROVE retry of PR #592 cannot proceed because live gitea-reviewer still runs pre-#595 code and lacks gitea_cleanup_stale_review_decision_lock WHO_IS_NEXT: user NEXT_ACTION: Fast-forward root checkout to prgs/master at ac531dd or later, fully restart/reconnect gitea-reviewer from that code, verify cleanup tool is registered, then re-run formal APPROVE of PR #592 at head b810e512fd9f50b7c0106305914ad79553faee12 NEXT_PROMPT: ```text Gitea reviewer task. Invoke gitea-workflow first. Retry formal review of PR #592 after root checkout is on prgs/master containing ac531dd and gitea-reviewer MCP has been fully restarted. Prerequisites: gitea_whoami(remote=prgs)=sysadmin/prgs-reviewer; gitea_cleanup_stale_review_decision_lock available. Target: PR #592 / Issue #590 / head b810e512fd9f50b7c0106305914ad79553faee12 / APPROVE. If #332 stale decision lock blocks, dry-run then apply gitea_cleanup_stale_review_decision_lock(expected_terminal_pr=586, remote=prgs, org=Scaled-Tech-Consulting, repo=Gitea-Tools). Load workflow, acquire lease, mark final APPROVE, submit formal APPROVE. Do not merge. Isolated worktree under branches/. ``` WHAT_HAPPENED: Identity OK (sysadmin/prgs-reviewer). PR #592 open at expected head b810e512fd9f50b7c0106305914ad79553faee12 (mergeable=false). PR #595 is on prgs/master (ac531dd) but root control checkout remains at 6913ac9 (4 commits behind). Live MCP tool catalog does not include gitea_cleanup_stale_review_decision_lock. Formal lease/mark/submit not attempted. WHY: MCP processes load root mcp_server.py from behind-master checkout; #595 cleanup tool exists only at/after ac531dd. Cannot use manual session-state deletion. Root-guard (#475) also blocks mutations until control checkout matches prgs/master unless operating from a branches/ worktree. RELATED_PRS: #592 (this PR), #595 (landed cleanup tool, closes #594), #593 (open auto-restart MCP, #591), #586 (prior terminal PR referenced by stale #332 lock history) BLOCKERS: live gitea-reviewer runtime missing #595 tool surface; root HEAD behind prgs/master; possible residual #332 lock for PR #586 once runtime is current; live mergeable=false for #592 VALIDATION: gitea_whoami remote=prgs -> sysadmin/prgs-reviewer; gitea_list_prs head_sha=b810e512; search_tool miss for cleanup tool; disk proof cleanup tool absent on root, present in branches/reviewer-pr592-retry@ac531dd LAST_UPDATED_BY: prgs-reviewer (sysadmin) formal-review retry session 2026-07-09
Owner

repo: Scaled-Tech-Consulting/Gitea-Tools
pr: #592
issue: #590
reviewer_identity: sysadmin
profile: prgs-reviewer
session_id: 23139-da018dab43ba
worktree: /Users/jasonwalker/Development/Gitea-Tools/branches/review-pr-592-issue-590
phase: claimed
candidate_head: b810e512fd
target_branch: master
target_branch_sha: none
last_activity: 2026-07-09T20:16:18Z
expires_at: 2026-07-09T22:16:18Z
blocker: none

<!-- mcp-review-lease:v1 --> repo: Scaled-Tech-Consulting/Gitea-Tools pr: #592 issue: #590 reviewer_identity: sysadmin profile: prgs-reviewer session_id: 23139-da018dab43ba worktree: /Users/jasonwalker/Development/Gitea-Tools/branches/review-pr-592-issue-590 phase: claimed candidate_head: b810e512fd9f50b7c0106305914ad79553faee12 target_branch: master target_branch_sha: none last_activity: 2026-07-09T20:16:18Z expires_at: 2026-07-09T22:16:18Z blocker: none
Owner

repo: Scaled-Tech-Consulting/Gitea-Tools
pr: #592
issue: #590
reviewer_identity: sysadmin
profile: prgs-reviewer
session_id: 23139-da018dab43ba
worktree: /Users/jasonwalker/Development/Gitea-Tools/branches/review-pr-592-issue-590
phase: released
candidate_head: b810e512fd
target_branch: master
target_branch_sha: none
last_activity: 2026-07-09T20:25:14Z
expires_at: 2026-07-09T22:25:14Z
blocker: manual-release

<!-- mcp-review-lease:v1 --> repo: Scaled-Tech-Consulting/Gitea-Tools pr: #592 issue: #590 reviewer_identity: sysadmin profile: prgs-reviewer session_id: 23139-da018dab43ba worktree: /Users/jasonwalker/Development/Gitea-Tools/branches/review-pr-592-issue-590 phase: released candidate_head: b810e512fd9f50b7c0106305914ad79553faee12 target_branch: master target_branch_sha: none last_activity: 2026-07-09T20:25:14Z expires_at: 2026-07-09T22:25:14Z blocker: manual-release
Owner

Canonical Issue State

STATE: recovery partial — root checkout and MCP process restart complete; this Grok session still cannot call gitea_cleanup_stale_review_decision_lock (client tool catalog not re-listed)
WHO_IS_NEXT: user
NEXT_ACTION: Start a fresh Grok session (or fully reconnect Gitea MCP namespaces so list_tools re-runs), confirm gitea_cleanup_stale_review_decision_lock is in search_tool, then retry formal review of PR #592 at head b810e512fd. Reassess APPROVE vs REQUEST_CHANGES because live mergeable=false after master advanced past #595.
NEXT_PROMPT:

Gitea reviewer task. Invoke gitea-workflow first.
New session after MCP recovery. Verify gitea_whoami(remote=prgs)=sysadmin/prgs-reviewer and gitea_cleanup_stale_review_decision_lock is available via search_tool.
Then formal review PR #592 / Issue #590 / head b810e512fd9f50b7c0106305914ad79553faee12. Live mergeable=false — decide APPROVE vs REQUEST_CHANGES from live state. If #332 stale lock remains, use only gitea_cleanup_stale_review_decision_lock(expected_terminal_pr=586). Do not merge. Isolated worktree under branches/.

WHAT_HAPPENED: Operator recovery run (2026-07-09). Root control checkout is clean at ac531dda05 (matches prgs/master; was already there at recovery start, not 6913ac9). Gitea MCP processes killed and respawned under grok (new PIDs ~51505+ at 16:23 local). gitea_whoami and gitea_resolve_task_capability(review_pr) succeed on live gitea-reviewer. Fresh stdio list_tools against current master code reports 74 tools including gitea_cleanup_stale_review_decision_lock. This Grok session search_tool/use_tool still does not expose that tool (session catalog stuck pre-#595). Formal review not submitted.
WHY: Host process now runs #595 code, but mid-session MCP tool rediscovery did not repopulate the client tool registry. Also PR #592 remains mergeable=false vs current master — formal decision may need to be REQUEST_CHANGES for conflicts rather than pure APPROVE.
RELATED_PRS: #592, #595 (landed), #591/#593 (auto-restart still needed)
BLOCKERS: client session missing gitea_cleanup_stale_review_decision_lock; unblock when a new session/list_tools exposes the tool; then recheck mergeable before approving
VALIDATION: HEAD=ac531dd clean; whoami sysadmin/prgs-reviewer; resolve review_pr ok; MCP list_tools has_cleanup=True count=74; search_tool miss for cleanup in this session; PR #592 head b810e512 mergeable=false
LAST_UPDATED_BY: prgs-reviewer (sysadmin) MCP operator recovery 2026-07-09

## Canonical Issue State STATE: recovery partial — root checkout and MCP process restart complete; this Grok session still cannot call gitea_cleanup_stale_review_decision_lock (client tool catalog not re-listed) WHO_IS_NEXT: user NEXT_ACTION: Start a fresh Grok session (or fully reconnect Gitea MCP namespaces so list_tools re-runs), confirm gitea_cleanup_stale_review_decision_lock is in search_tool, then retry formal review of PR #592 at head b810e512fd9f50b7c0106305914ad79553faee12. Reassess APPROVE vs REQUEST_CHANGES because live mergeable=false after master advanced past #595. NEXT_PROMPT: ```text Gitea reviewer task. Invoke gitea-workflow first. New session after MCP recovery. Verify gitea_whoami(remote=prgs)=sysadmin/prgs-reviewer and gitea_cleanup_stale_review_decision_lock is available via search_tool. Then formal review PR #592 / Issue #590 / head b810e512fd9f50b7c0106305914ad79553faee12. Live mergeable=false — decide APPROVE vs REQUEST_CHANGES from live state. If #332 stale lock remains, use only gitea_cleanup_stale_review_decision_lock(expected_terminal_pr=586). Do not merge. Isolated worktree under branches/. ``` WHAT_HAPPENED: Operator recovery run (2026-07-09). Root control checkout is clean at ac531dda05858d17360aab17744e1a489e7d0aba (matches prgs/master; was already there at recovery start, not 6913ac9). Gitea MCP processes killed and respawned under grok (new PIDs ~51505+ at 16:23 local). gitea_whoami and gitea_resolve_task_capability(review_pr) succeed on live gitea-reviewer. Fresh stdio list_tools against current master code reports 74 tools including gitea_cleanup_stale_review_decision_lock. This Grok session search_tool/use_tool still does not expose that tool (session catalog stuck pre-#595). Formal review not submitted. WHY: Host process now runs #595 code, but mid-session MCP tool rediscovery did not repopulate the client tool registry. Also PR #592 remains mergeable=false vs current master — formal decision may need to be REQUEST_CHANGES for conflicts rather than pure APPROVE. RELATED_PRS: #592, #595 (landed), #591/#593 (auto-restart still needed) BLOCKERS: client session missing gitea_cleanup_stale_review_decision_lock; unblock when a new session/list_tools exposes the tool; then recheck mergeable before approving VALIDATION: HEAD=ac531dd clean; whoami sysadmin/prgs-reviewer; resolve review_pr ok; MCP list_tools has_cleanup=True count=74; search_tool miss for cleanup in this session; PR #592 head b810e512 mergeable=false LAST_UPDATED_BY: prgs-reviewer (sysadmin) MCP operator recovery 2026-07-09
Owner

repo: Scaled-Tech-Consulting/Gitea-Tools
pr: #592
issue: #590
reviewer_identity: sysadmin
profile: prgs-reviewer
session_id: 51515-2bfb70f0685f
worktree: /Users/jasonwalker/Development/Gitea-Tools/branches/review-pr-592-issue-590
phase: claimed
candidate_head: b810e512fd
target_branch: master
target_branch_sha: ac531dda05
last_activity: 2026-07-09T20:25:49Z
expires_at: 2026-07-09T22:25:49Z
blocker: none

<!-- mcp-review-lease:v1 --> repo: Scaled-Tech-Consulting/Gitea-Tools pr: #592 issue: #590 reviewer_identity: sysadmin profile: prgs-reviewer session_id: 51515-2bfb70f0685f worktree: /Users/jasonwalker/Development/Gitea-Tools/branches/review-pr-592-issue-590 phase: claimed candidate_head: b810e512fd9f50b7c0106305914ad79553faee12 target_branch: master target_branch_sha: ac531dda05858d17360aab17744e1a489e7d0aba last_activity: 2026-07-09T20:25:49Z expires_at: 2026-07-09T22:25:49Z blocker: none
Owner

Canonical Issue State

STATE: BLOCKED
WHO_IS_NEXT: user
NEXT_ACTION: Clear the active #332 terminal path for open PR #593 (merge #593 if approved-and-ready, or complete that review sequence) so a new formal REQUEST_CHANGES can land on PR #592; also ensure the Grok host re-discovers gitea_cleanup_stale_review_decision_lock after MCP restart (tool is in root source at ac531dd but not yet in this session's MCP tool catalog).
NEXT_PROMPT:

After #332 session budget is free for a new terminal review (no open-PR approve lock remaining on prgs-reviewer), formal REQUEST_CHANGES on Scaled-Tech-Consulting/Gitea-Tools PR #592 at b810e512fd9f50b7c0106305914ad79553faee12:

PR is mergeable=false after master advanced with #595. git merge-tree shows conflicts in tests/conftest.py and tests/test_mcp_server.py (overlap with #595 isolation). tests/test_session_state_isolation.py is still unique to this branch. Author must rebase/restack onto master and resolve overlaps.

Do not APPROVE while conflicted. Use gitea_cleanup_stale_review_decision_lock only for merged/closed prior terminals.

WHAT_HAPPENED: Operator recovery partially completed: root fast-forwarded to prgs/master ac531dda05 (PR #595 present; gitea_cleanup_stale_review_decision_lock defined in root source). gitea-reviewer whoami is sysadmin/prgs-reviewer; resolve review_pr succeeds; workflow load hash da045d1e1f1f (new master skill). Formal mark for REQUEST_CHANGES failed: #332 terminal approve on still-open PR #593 blocks new terminal reviews. Host MCP tool catalog still returns Tool not found for gitea_cleanup_stale_review_decision_lock (client registry not refreshed). Even if cleanup were callable, #593 is open so moot cleanup would correctly refuse. Live merge-tree proves PR #592 conflicts with master on conftest/test_mcp_server; isolation largely overlaps #595; mergeable=false.
WHY: Correct #332 behavior for an approved open PR (#593) prevents cross-PR terminal mutations. Cleanup tool cannot clear open-PR terminals. REQUEST_CHANGES for #592 is the correct technical verdict once the session budget is free, because of live conflicts/redundancy with #595, not APPROVE.
RELATED_PRS: #592, #590, #595 (landed), #593 (open terminal approve holding #332 budget)
BLOCKERS: UNBLOCK formal REQUEST_CHANGES when prgs-reviewer decision lock has no terminal live mutation for an open PR (finish merge sequence for #593 or otherwise exhaust that path). Separately UNBLOCK cleanup-tool host discovery when the MCP client re-lists tools from restarted server on master.
VALIDATION:

  • root SHA after FF: ac531dda05
  • whoami: sysadmin / prgs-reviewer
  • PR head: b810e512fd9f50b7c0106305914ad79553faee12; open; mergeable=false
  • merge-tree conflicts: tests/conftest.py, tests/test_mcp_server.py
  • unique remaining file: tests/test_session_state_isolation.py
  • lease acquired then released/reacquired: comment 8647 (session 51515-2bfb70f0685f)
  • formal review: NOT submitted
    LAST_UPDATED_BY: sysadmin (prgs-reviewer)
## Canonical Issue State STATE: BLOCKED WHO_IS_NEXT: user NEXT_ACTION: Clear the active #332 terminal path for open PR #593 (merge #593 if approved-and-ready, or complete that review sequence) so a new formal REQUEST_CHANGES can land on PR #592; also ensure the Grok host re-discovers gitea_cleanup_stale_review_decision_lock after MCP restart (tool is in root source at ac531dd but not yet in this session's MCP tool catalog). NEXT_PROMPT: ```text After #332 session budget is free for a new terminal review (no open-PR approve lock remaining on prgs-reviewer), formal REQUEST_CHANGES on Scaled-Tech-Consulting/Gitea-Tools PR #592 at b810e512fd9f50b7c0106305914ad79553faee12: PR is mergeable=false after master advanced with #595. git merge-tree shows conflicts in tests/conftest.py and tests/test_mcp_server.py (overlap with #595 isolation). tests/test_session_state_isolation.py is still unique to this branch. Author must rebase/restack onto master and resolve overlaps. Do not APPROVE while conflicted. Use gitea_cleanup_stale_review_decision_lock only for merged/closed prior terminals. ``` WHAT_HAPPENED: Operator recovery partially completed: root fast-forwarded to prgs/master ac531dda05858d17360aab17744e1a489e7d0aba (PR #595 present; gitea_cleanup_stale_review_decision_lock defined in root source). gitea-reviewer whoami is sysadmin/prgs-reviewer; resolve review_pr succeeds; workflow load hash da045d1e1f1f (new master skill). Formal mark for REQUEST_CHANGES failed: #332 terminal approve on still-open PR #593 blocks new terminal reviews. Host MCP tool catalog still returns Tool not found for gitea_cleanup_stale_review_decision_lock (client registry not refreshed). Even if cleanup were callable, #593 is open so moot cleanup would correctly refuse. Live merge-tree proves PR #592 conflicts with master on conftest/test_mcp_server; isolation largely overlaps #595; mergeable=false. WHY: Correct #332 behavior for an approved open PR (#593) prevents cross-PR terminal mutations. Cleanup tool cannot clear open-PR terminals. REQUEST_CHANGES for #592 is the correct technical verdict once the session budget is free, because of live conflicts/redundancy with #595, not APPROVE. RELATED_PRS: #592, #590, #595 (landed), #593 (open terminal approve holding #332 budget) BLOCKERS: UNBLOCK formal REQUEST_CHANGES when prgs-reviewer decision lock has no terminal live mutation for an open PR (finish merge sequence for #593 or otherwise exhaust that path). Separately UNBLOCK cleanup-tool host discovery when the MCP client re-lists tools from restarted server on master. VALIDATION: - root SHA after FF: ac531dda05858d17360aab17744e1a489e7d0aba - whoami: sysadmin / prgs-reviewer - PR head: b810e512fd9f50b7c0106305914ad79553faee12; open; mergeable=false - merge-tree conflicts: tests/conftest.py, tests/test_mcp_server.py - unique remaining file: tests/test_session_state_isolation.py - lease acquired then released/reacquired: comment 8647 (session 51515-2bfb70f0685f) - formal review: NOT submitted LAST_UPDATED_BY: sysadmin (prgs-reviewer)
Owner

repo: Scaled-Tech-Consulting/Gitea-Tools
pr: #592
issue: #590
reviewer_identity: sysadmin
profile: prgs-reviewer
session_id: 51515-2bfb70f0685f
worktree: /Users/jasonwalker/Development/Gitea-Tools/branches/review-pr-592-issue-590
phase: claimed
candidate_head: b810e512fd
target_branch: master
target_branch_sha: 683649424b
last_activity: 2026-07-09T21:06:23Z
expires_at: 2026-07-09T23:06:23Z
blocker: none

<!-- mcp-review-lease:v1 --> repo: Scaled-Tech-Consulting/Gitea-Tools pr: #592 issue: #590 reviewer_identity: sysadmin profile: prgs-reviewer session_id: 51515-2bfb70f0685f worktree: /Users/jasonwalker/Development/Gitea-Tools/branches/review-pr-592-issue-590 phase: claimed candidate_head: b810e512fd9f50b7c0106305914ad79553faee12 target_branch: master target_branch_sha: 683649424b5b6e474007a900847b21579f1835b8 last_activity: 2026-07-09T21:06:23Z expires_at: 2026-07-09T23:06:23Z blocker: none
Owner

repo: Scaled-Tech-Consulting/Gitea-Tools
pr: #592
issue: #590
reviewer_identity: sysadmin
profile: prgs-reviewer
session_id: 51515-2bfb70f0685f
worktree: /Users/jasonwalker/Development/Gitea-Tools/branches/review-pr-592-issue-590
phase: released
candidate_head: b810e512fd
target_branch: master
target_branch_sha: 683649424b
last_activity: 2026-07-09T21:06:40Z
expires_at: 2026-07-09T23:06:40Z
blocker: manual-release

<!-- mcp-review-lease:v1 --> repo: Scaled-Tech-Consulting/Gitea-Tools pr: #592 issue: #590 reviewer_identity: sysadmin profile: prgs-reviewer session_id: 51515-2bfb70f0685f worktree: /Users/jasonwalker/Development/Gitea-Tools/branches/review-pr-592-issue-590 phase: released candidate_head: b810e512fd9f50b7c0106305914ad79553faee12 target_branch: master target_branch_sha: 683649424b5b6e474007a900847b21579f1835b8 last_activity: 2026-07-09T21:06:40Z expires_at: 2026-07-09T23:06:40Z blocker: manual-release
Owner

repo: Scaled-Tech-Consulting/Gitea-Tools
pr: #592
issue: #590
reviewer_identity: sysadmin
profile: prgs-reviewer
session_id: 24433-1b0938eef4a2
worktree: /Users/jasonwalker/Development/Gitea-Tools/branches/review-pr-592-resume-20260709170338
phase: claimed
candidate_head: b810e512fd
target_branch: master
target_branch_sha: 683649424b
last_activity: 2026-07-09T21:08:00Z
expires_at: 2026-07-09T23:08:00Z
blocker: none

<!-- mcp-review-lease:v1 --> repo: Scaled-Tech-Consulting/Gitea-Tools pr: #592 issue: #590 reviewer_identity: sysadmin profile: prgs-reviewer session_id: 24433-1b0938eef4a2 worktree: /Users/jasonwalker/Development/Gitea-Tools/branches/review-pr-592-resume-20260709170338 phase: claimed candidate_head: b810e512fd9f50b7c0106305914ad79553faee12 target_branch: master target_branch_sha: 683649424b5b6e474007a900847b21579f1835b8 last_activity: 2026-07-09T21:08:00Z expires_at: 2026-07-09T23:08:00Z blocker: none
Owner

repo: Scaled-Tech-Consulting/Gitea-Tools
pr: #592
issue: #590
reviewer_identity: sysadmin
profile: prgs-reviewer
session_id: 24433-1b0938eef4a2
worktree: /Users/jasonwalker/Development/Gitea-Tools/branches/review-pr-592-resume-20260709170338
phase: claimed
candidate_head: b810e512fd
target_branch: master
target_branch_sha: 683649424b
last_activity: 2026-07-09T21:09:07Z
expires_at: 2026-07-09T23:09:07Z
blocker: none

<!-- mcp-review-lease:v1 --> repo: Scaled-Tech-Consulting/Gitea-Tools pr: #592 issue: #590 reviewer_identity: sysadmin profile: prgs-reviewer session_id: 24433-1b0938eef4a2 worktree: /Users/jasonwalker/Development/Gitea-Tools/branches/review-pr-592-resume-20260709170338 phase: claimed candidate_head: b810e512fd9f50b7c0106305914ad79553faee12 target_branch: master target_branch_sha: 683649424b5b6e474007a900847b21579f1835b8 last_activity: 2026-07-09T21:09:07Z expires_at: 2026-07-09T23:09:07Z blocker: none
sysadmin requested changes 2026-07-09 16:10:09 -05:00
Dismissed
sysadmin left a comment
Owner

Canonical PR State

STATE: open / conflicted / not mergeable — formal REQUEST_CHANGES
WHO_IS_NEXT: author
NEXT_ACTION: Rebase PR #592 onto current prgs/master, resolve conflicts in tests/conftest.py and tests/test_mcp_server.py, re-run stated pytest suite, push updated head, re-request review.
NEXT_PROMPT:

Rebase open PR #592 (issue #590, head b810e512fd9f50b7c0106305914ad79553faee12) onto current prgs/master (now includes merged #593 and prior #594/#595). Resolve conflicts in tests/conftest.py and tests/test_mcp_server.py keeping master isolation wording plus #590 isolation pins and regression tests. Re-run: pytest tests/test_mcp_server.py::TestMergePR -q; pytest tests/test_session_state_isolation.py tests/test_mcp_session_state.py tests/test_terminal_review_hard_stop.py tests/test_review_workflow_load.py -q. Push rebased head on fix/issue-590-ledger-isolation and request re-review on Gitea-Tools PR #592 (remote=prgs, org=Scaled-Tech-Consulting, repo=Gitea-Tools). Stay out of Timesheet.

WHAT_HAPPENED: After #332 cleanup (moot terminal approve on merged PR #593, merge_commit 68364942, audit comment #8718), formal re-review of PR #592. Live: open, mergeable=false, head still b810e512. Conflicts vs master in tests/conftest.py and tests/test_mcp_server.py. Intent of #590 remains valid but head is not mergeable — REQUEST_CHANGES (not APPROVE).
WHY: Cannot approve a conflicted/non-mergeable head after master advanced (session-state isolation landings including #593/#594/#595).
ISSUE: #590 (PR #592)
HEAD_SHA: b810e512fd
REVIEW_STATUS: REQUEST_CHANGES
MERGE_READY: no
BLOCKERS: mergeable=false; file conflicts tests/conftest.py and tests/test_mcp_server.py vs master — unblock when rebased onto master, conflicts resolved, tests green, new head pushed and re-reviewed
VALIDATION: #332 cleanup applied for terminal PR #593; gitea_view_pr #592 open mergeable=false; head b810e512; eligibility request_changes=true; dry-run then gated submit; no mtime/source-file manipulation
LAST_UPDATED_BY: prgs-reviewer (sysadmin)

## Canonical PR State STATE: open / conflicted / not mergeable — formal REQUEST_CHANGES WHO_IS_NEXT: author NEXT_ACTION: Rebase PR #592 onto current prgs/master, resolve conflicts in tests/conftest.py and tests/test_mcp_server.py, re-run stated pytest suite, push updated head, re-request review. NEXT_PROMPT: ```text Rebase open PR #592 (issue #590, head b810e512fd9f50b7c0106305914ad79553faee12) onto current prgs/master (now includes merged #593 and prior #594/#595). Resolve conflicts in tests/conftest.py and tests/test_mcp_server.py keeping master isolation wording plus #590 isolation pins and regression tests. Re-run: pytest tests/test_mcp_server.py::TestMergePR -q; pytest tests/test_session_state_isolation.py tests/test_mcp_session_state.py tests/test_terminal_review_hard_stop.py tests/test_review_workflow_load.py -q. Push rebased head on fix/issue-590-ledger-isolation and request re-review on Gitea-Tools PR #592 (remote=prgs, org=Scaled-Tech-Consulting, repo=Gitea-Tools). Stay out of Timesheet. ``` WHAT_HAPPENED: After #332 cleanup (moot terminal approve on merged PR #593, merge_commit 68364942, audit comment #8718), formal re-review of PR #592. Live: open, mergeable=false, head still b810e512. Conflicts vs master in tests/conftest.py and tests/test_mcp_server.py. Intent of #590 remains valid but head is not mergeable — REQUEST_CHANGES (not APPROVE). WHY: Cannot approve a conflicted/non-mergeable head after master advanced (session-state isolation landings including #593/#594/#595). ISSUE: #590 (PR #592) HEAD_SHA: b810e512fd9f50b7c0106305914ad79553faee12 REVIEW_STATUS: REQUEST_CHANGES MERGE_READY: no BLOCKERS: mergeable=false; file conflicts tests/conftest.py and tests/test_mcp_server.py vs master — unblock when rebased onto master, conflicts resolved, tests green, new head pushed and re-reviewed VALIDATION: #332 cleanup applied for terminal PR #593; gitea_view_pr #592 open mergeable=false; head b810e512; eligibility request_changes=true; dry-run then gated submit; no mtime/source-file manipulation LAST_UPDATED_BY: prgs-reviewer (sysadmin)
Owner

repo: Scaled-Tech-Consulting/Gitea-Tools
pr: #592
issue: #590
reviewer_identity: sysadmin
profile: prgs-reviewer
session_id: 24433-1b0938eef4a2
worktree: /Users/jasonwalker/Development/Gitea-Tools/branches/review-pr-592-resume-20260709170338
phase: released
candidate_head: b810e512fd
target_branch: master
target_branch_sha: 683649424b
last_activity: 2026-07-09T21:11:27Z
expires_at: 2026-07-09T23:11:27Z
blocker: manual-release

<!-- mcp-review-lease:v1 --> repo: Scaled-Tech-Consulting/Gitea-Tools pr: #592 issue: #590 reviewer_identity: sysadmin profile: prgs-reviewer session_id: 24433-1b0938eef4a2 worktree: /Users/jasonwalker/Development/Gitea-Tools/branches/review-pr-592-resume-20260709170338 phase: released candidate_head: b810e512fd9f50b7c0106305914ad79553faee12 target_branch: master target_branch_sha: 683649424b5b6e474007a900847b21579f1835b8 last_activity: 2026-07-09T21:11:27Z expires_at: 2026-07-09T23:11:27Z blocker: manual-release
jcwalker3 force-pushed fix/issue-590-ledger-isolation from b810e512fd to 0bbf46b56d 2026-07-09 16:19:52 -05:00 Compare
jcwalker3 added 2 commits 2026-07-09 16:21:23 -05:00
Tests that call patch.dict(os.environ, clear=True) dropped
GITEA_MCP_SESSION_STATE_DIR and re-adopted the operator host cache
under ~/.cache/gitea-tools/session-state. A residual terminal
request_changes mutation then tripped the #332 hard-stop before
test_unknown_profile_blocks could assert the empty-profile gate.

- Pin mcp_session_state.default_state_dir / DEFAULT_STATE_DIR to a
  per-test temp dir in conftest (still honors an explicit env override)
- Clear the decision lock at the start of each TestMergePR test
- Add regression coverage for env-clear isolation

Closes #590
patch.dict(os.environ, clear=True) also drops PYTEST_CURRENT_TEST, which
re-enables live MCP process health checks against operator daemons and
makes merge-gate unit tests environment-dependent. Stub the diagnostic
in conftest so unit tests stay isolated.
jcwalker3 force-pushed fix/issue-590-ledger-isolation from 0bbf46b56d to 008cd3fd74 2026-07-09 16:21:23 -05:00 Compare
Owner

Canonical Issue State

STATE: open / rebased / mergeable — ready for re-review
WHO_IS_NEXT: reviewer
NEXT_ACTION: Formal re-review (APPROVE path) of PR #592 at new head 0bbf46b56d6ee3c69c0627e95ba27f10bab9b9a3; do not merge until approved at this SHA.
NEXT_PROMPT:

Gitea reviewer task. Formal re-review Scaled-Tech-Consulting/Gitea-Tools PR #592 (Issue #590) after author rebase.
Pin expected_head_sha=0bbf46b56d6ee3c69c0627e95ba27f10bab9b9a3
remote=prgs org=Scaled-Tech-Consulting repo=Gitea-Tools
Live mergeable=true; prior REQUEST_CHANGES is stale (author_pushed_after_request_changes=true).
Validate in isolated branches/ worktree; mark_final approve; submit APPROVE. Do not merge.

WHAT_HAPPENED: Rebased fix/issue-590-ledger-isolation onto prgs/master (6836494). Resolved conflicts in tests/conftest.py and tests/test_mcp_server.py (kept master #594 isolation + #590 pin/docs + regression tests). Force-with-lease pushed new head 0bbf46b. Second PR commit dropped as already upstream.
WHY: Addresses formal REQUEST_CHANGES for mergeable=false / content conflicts after #593/#594/#595 landed on master.
RELATED_PRS: #592 (this PR), #590 (issue), #593/#594/#595 (landed masters that caused the rebase)
BLOCKERS: none for re-review — formal APPROVE still required before merge
VALIDATION:

  • git rebase prgs/master: success; merge-tree clean; master is ancestor of head
  • pytest tests/test_mcp_server.py::TestMergePR -q: 23 passed
  • pytest tests/test_mcp_server.py -q: 207 passed
  • pytest tests/test_session_state_isolation.py tests/test_mcp_session_state.py tests/test_terminal_review_hard_stop.py tests/test_review_workflow_load.py -q: 32 passed
  • git diff --check prgs/master...HEAD: clean
  • live gitea_view_pr: mergeable=true; head 0bbf46b56d
    LAST_UPDATED_BY: author-session (rebase operator) / 2026-07-09
## Canonical Issue State STATE: open / rebased / mergeable — ready for re-review WHO_IS_NEXT: reviewer NEXT_ACTION: Formal re-review (APPROVE path) of PR #592 at new head 0bbf46b56d6ee3c69c0627e95ba27f10bab9b9a3; do not merge until approved at this SHA. NEXT_PROMPT: ```text Gitea reviewer task. Formal re-review Scaled-Tech-Consulting/Gitea-Tools PR #592 (Issue #590) after author rebase. Pin expected_head_sha=0bbf46b56d6ee3c69c0627e95ba27f10bab9b9a3 remote=prgs org=Scaled-Tech-Consulting repo=Gitea-Tools Live mergeable=true; prior REQUEST_CHANGES is stale (author_pushed_after_request_changes=true). Validate in isolated branches/ worktree; mark_final approve; submit APPROVE. Do not merge. ``` WHAT_HAPPENED: Rebased fix/issue-590-ledger-isolation onto prgs/master (6836494). Resolved conflicts in tests/conftest.py and tests/test_mcp_server.py (kept master #594 isolation + #590 pin/docs + regression tests). Force-with-lease pushed new head 0bbf46b. Second PR commit dropped as already upstream. WHY: Addresses formal REQUEST_CHANGES for mergeable=false / content conflicts after #593/#594/#595 landed on master. RELATED_PRS: #592 (this PR), #590 (issue), #593/#594/#595 (landed masters that caused the rebase) BLOCKERS: none for re-review — formal APPROVE still required before merge VALIDATION: - git rebase prgs/master: success; merge-tree clean; master is ancestor of head - pytest tests/test_mcp_server.py::TestMergePR -q: 23 passed - pytest tests/test_mcp_server.py -q: 207 passed - pytest tests/test_session_state_isolation.py tests/test_mcp_session_state.py tests/test_terminal_review_hard_stop.py tests/test_review_workflow_load.py -q: 32 passed - git diff --check prgs/master...HEAD: clean - live gitea_view_pr: mergeable=true; head 0bbf46b56d6ee3c69c0627e95ba27f10bab9b9a3 LAST_UPDATED_BY: author-session (rebase operator) / 2026-07-09
Author
Owner

Canonical Issue State

STATE: open / rebased / mergeable — awaiting re-review after REQUEST_CHANGES
WHO_IS_NEXT: reviewer
NEXT_ACTION: Formal re-review of PR #592 at new head 008cd3fd74 (prior REQUEST_CHANGES was at b810e512).
NEXT_PROMPT:

Reviewer re-review Scaled-Tech-Consulting/Gitea-Tools PR #592 (Issue #590) after author rebase.
Pin head 008cd3fd742c4005ecd94ff4be97e8eb63d526ca. Prior REQUEST_CHANGES at b810e512 is stale once head advanced.
Validate isolation fix for #590 on rebased branch; mergeable=true expected. Isolated worktree under branches/. Do not use author namespace for review/merge.

WHAT_HAPPENED: Author (jcwalker3 / prgs-author) rebased fix/issue-590-ledger-isolation onto prgs/master 68364942. Resolved conflicts in tests/conftest.py and tests/test_mcp_server.py keeping master #594-aware wording plus #590 isolation pins, regression tests, and test_session_state_isolation.py. Force-with-lease push updated remote head b810e512/0bbf46b → 008cd3fd.
WHY: Unblock REQUEST_CHANGES (mergeable=false / conflicted vs master after #593/#594/#595).
RELATED_PRS: #592 (this PR), #590 (issue), #593/#594/#595 (master landings that caused conflict)
BLOCKERS: none for author path; UNBLOCK for merge when formal re-review approves head 008cd3fd and merger path is free
VALIDATION:

  • pytest tests/test_mcp_server.py::TestMergePR -q → 23 passed
  • pytest isolation/session/hard-stop/workflow suites -q → 32 passed
  • pytest tests/test_mcp_server.py -q → 207 passed
  • local merge-tree vs prgs/master → no conflicts
  • gitea_view_pr mergeable=true
    LAST_UPDATED_BY: prgs-author (jcwalker3)
## Canonical Issue State STATE: open / rebased / mergeable — awaiting re-review after REQUEST_CHANGES WHO_IS_NEXT: reviewer NEXT_ACTION: Formal re-review of PR #592 at new head 008cd3fd742c4005ecd94ff4be97e8eb63d526ca (prior REQUEST_CHANGES was at b810e512). NEXT_PROMPT: ```text Reviewer re-review Scaled-Tech-Consulting/Gitea-Tools PR #592 (Issue #590) after author rebase. Pin head 008cd3fd742c4005ecd94ff4be97e8eb63d526ca. Prior REQUEST_CHANGES at b810e512 is stale once head advanced. Validate isolation fix for #590 on rebased branch; mergeable=true expected. Isolated worktree under branches/. Do not use author namespace for review/merge. ``` WHAT_HAPPENED: Author (jcwalker3 / prgs-author) rebased fix/issue-590-ledger-isolation onto prgs/master 68364942. Resolved conflicts in tests/conftest.py and tests/test_mcp_server.py keeping master #594-aware wording plus #590 isolation pins, regression tests, and test_session_state_isolation.py. Force-with-lease push updated remote head b810e512/0bbf46b → 008cd3fd. WHY: Unblock REQUEST_CHANGES (mergeable=false / conflicted vs master after #593/#594/#595). RELATED_PRS: #592 (this PR), #590 (issue), #593/#594/#595 (master landings that caused conflict) BLOCKERS: none for author path; UNBLOCK for merge when formal re-review approves head 008cd3fd and merger path is free VALIDATION: - pytest tests/test_mcp_server.py::TestMergePR -q → 23 passed - pytest isolation/session/hard-stop/workflow suites -q → 32 passed - pytest tests/test_mcp_server.py -q → 207 passed - local merge-tree vs prgs/master → no conflicts - gitea_view_pr mergeable=true LAST_UPDATED_BY: prgs-author (jcwalker3)
Owner

Canonical Issue State

STATE: open / rebased / mergeable — re-review requested at live head
WHO_IS_NEXT: reviewer
NEXT_ACTION: Formal re-review APPROVE of PR #592 at live head 008cd3fd742c4005ecd94ff4be97e8eb63d526ca; do not merge until approved at this SHA.
NEXT_PROMPT:

Gitea reviewer task. Formal re-review Scaled-Tech-Consulting/Gitea-Tools PR #592 (Issue #590).
Pin expected_head_sha=008cd3fd742c4005ecd94ff4be97e8eb63d526ca
remote=prgs org=Scaled-Tech-Consulting repo=Gitea-Tools
mergeable=true; prior REQUEST_CHANGES stale. Approve only; do not merge.

WHAT_HAPPENED: Branch rebased onto prgs/master and force-pushed. Live head is 008cd3fd74 (two-commit rebased history; content-equivalent to intermediate 0bbf46b push). Conflicts in tests/conftest.py + tests/test_mcp_server.py resolved. Validation re-run green on live head.
WHY: Satisfies REQUEST_CHANGES for post-#593/#594/#595 master conflicts.
RELATED_PRS: #592 (this PR), #590 (issue), #593, #594, #595
BLOCKERS: none for re-review; formal APPROVE still required before merge
VALIDATION:

  • live head 008cd3fd742c4005ecd94ff4be97e8eb63d526ca; mergeable=true
  • master is ancestor; merge-tree clean
  • pytest TestMergePR + isolation/session/hard-stop/workflow suites: 55 passed on live head
  • prior full test_mcp_server: 207 passed on equivalent rebased tree
    LAST_UPDATED_BY: author-session (rebase operator) / 2026-07-09
## Canonical Issue State STATE: open / rebased / mergeable — re-review requested at live head WHO_IS_NEXT: reviewer NEXT_ACTION: Formal re-review APPROVE of PR #592 at live head 008cd3fd742c4005ecd94ff4be97e8eb63d526ca; do not merge until approved at this SHA. NEXT_PROMPT: ```text Gitea reviewer task. Formal re-review Scaled-Tech-Consulting/Gitea-Tools PR #592 (Issue #590). Pin expected_head_sha=008cd3fd742c4005ecd94ff4be97e8eb63d526ca remote=prgs org=Scaled-Tech-Consulting repo=Gitea-Tools mergeable=true; prior REQUEST_CHANGES stale. Approve only; do not merge. ``` WHAT_HAPPENED: Branch rebased onto prgs/master and force-pushed. Live head is 008cd3fd742c4005ecd94ff4be97e8eb63d526ca (two-commit rebased history; content-equivalent to intermediate 0bbf46b push). Conflicts in tests/conftest.py + tests/test_mcp_server.py resolved. Validation re-run green on live head. WHY: Satisfies REQUEST_CHANGES for post-#593/#594/#595 master conflicts. RELATED_PRS: #592 (this PR), #590 (issue), #593, #594, #595 BLOCKERS: none for re-review; formal APPROVE still required before merge VALIDATION: - live head 008cd3fd742c4005ecd94ff4be97e8eb63d526ca; mergeable=true - master is ancestor; merge-tree clean - pytest TestMergePR + isolation/session/hard-stop/workflow suites: 55 passed on live head - prior full test_mcp_server: 207 passed on equivalent rebased tree LAST_UPDATED_BY: author-session (rebase operator) / 2026-07-09
Owner

repo: Scaled-Tech-Consulting/Gitea-Tools
pr: #592
issue: #590
reviewer_identity: sysadmin
profile: prgs-reviewer
session_id: 24433-34b72d6a4872
worktree: /Users/jasonwalker/Development/Gitea-Tools/branches/review-pr-592-live-008cd3f
phase: claimed
candidate_head: 008cd3fd74
target_branch: master
target_branch_sha: 683649424b
last_activity: 2026-07-09T21:25:26Z
expires_at: 2026-07-09T23:25:26Z
blocker: none

<!-- mcp-review-lease:v1 --> repo: Scaled-Tech-Consulting/Gitea-Tools pr: #592 issue: #590 reviewer_identity: sysadmin profile: prgs-reviewer session_id: 24433-34b72d6a4872 worktree: /Users/jasonwalker/Development/Gitea-Tools/branches/review-pr-592-live-008cd3f phase: claimed candidate_head: 008cd3fd742c4005ecd94ff4be97e8eb63d526ca target_branch: master target_branch_sha: 683649424b5b6e474007a900847b21579f1835b8 last_activity: 2026-07-09T21:25:26Z expires_at: 2026-07-09T23:25:26Z blocker: none
sysadmin approved these changes 2026-07-09 16:27:06 -05:00
sysadmin left a comment
Owner

Canonical PR State

STATE: open / approved at rebased head — merge not performed
WHO_IS_NEXT: merger
NEXT_ACTION: Merge PR #592 only with explicit operator confirmation MERGE PR 592 at expected_head_sha 008cd3fd74.
NEXT_PROMPT:

Gitea merger task. Merge Scaled-Tech-Consulting/Gitea-Tools PR #592 only if operator explicitly authorizes.
expected_head_sha=008cd3fd742c4005ecd94ff4be97e8eb63d526ca
remote=prgs org=Scaled-Tech-Consulting repo=Gitea-Tools
Adopt reviewer lease; confirm MERGE PR 592; post-merge cleanup. Do not force-merge.

WHAT_HAPPENED: Formal APPROVE after author rebase onto prgs/master. Prior REQUEST_CHANGES at b810e51 is stale. Live mergeable=true. Scope remains tests-only isolation fix for #590.
WHY: Conflicts resolved; master is ancestor; validation green; no production code; production #332 hard-stop not weakened.
ISSUE: #590 (PR #592)
HEAD_SHA: 008cd3fd74
REVIEW_STATUS: APPROVED
MERGE_READY: yes
BLOCKERS: none for merge gate except explicit operator confirmation
VALIDATION:

  • identity sysadmin/prgs-reviewer; author jcwalker3; self_author=false
  • mergeable=true; head 008cd3fd74
  • master ancestor + merge-tree clean
  • pytest TestMergePR + isolation/session/hard-stop/workflow: 55 passed on live head
  • prior full tests/test_mcp_server.py: 207 passed on equivalent rebased content
  • files: tests/conftest.py, tests/test_mcp_server.py, tests/test_session_state_isolation.py
    LAST_UPDATED_BY: prgs-reviewer (sysadmin)
## Canonical PR State STATE: open / approved at rebased head — merge not performed WHO_IS_NEXT: merger NEXT_ACTION: Merge PR #592 only with explicit operator confirmation MERGE PR 592 at expected_head_sha 008cd3fd742c4005ecd94ff4be97e8eb63d526ca. NEXT_PROMPT: ```text Gitea merger task. Merge Scaled-Tech-Consulting/Gitea-Tools PR #592 only if operator explicitly authorizes. expected_head_sha=008cd3fd742c4005ecd94ff4be97e8eb63d526ca remote=prgs org=Scaled-Tech-Consulting repo=Gitea-Tools Adopt reviewer lease; confirm MERGE PR 592; post-merge cleanup. Do not force-merge. ``` WHAT_HAPPENED: Formal APPROVE after author rebase onto prgs/master. Prior REQUEST_CHANGES at b810e51 is stale. Live mergeable=true. Scope remains tests-only isolation fix for #590. WHY: Conflicts resolved; master is ancestor; validation green; no production code; production #332 hard-stop not weakened. ISSUE: #590 (PR #592) HEAD_SHA: 008cd3fd742c4005ecd94ff4be97e8eb63d526ca REVIEW_STATUS: APPROVED MERGE_READY: yes BLOCKERS: none for merge gate except explicit operator confirmation VALIDATION: - identity sysadmin/prgs-reviewer; author jcwalker3; self_author=false - mergeable=true; head 008cd3fd742c4005ecd94ff4be97e8eb63d526ca - master ancestor + merge-tree clean - pytest TestMergePR + isolation/session/hard-stop/workflow: 55 passed on live head - prior full tests/test_mcp_server.py: 207 passed on equivalent rebased content - files: tests/conftest.py, tests/test_mcp_server.py, tests/test_session_state_isolation.py LAST_UPDATED_BY: prgs-reviewer (sysadmin)
Owner

adopted_at: 2026-07-09T21:31:07Z
adopted_by_identity: sysadmin
adopted_by_profile: prgs-merger
adopted_from_session_id: 24433-34b72d6a4872
adopted_from_profile: prgs-reviewer
adopted_from_reviewer_identity: sysadmin
adopted_from_comment_id: 8891
adoption_reason: merger-handoff-approved-head

repo: Scaled-Tech-Consulting/Gitea-Tools
pr: #592
issue: #590
reviewer_identity: sysadmin
profile: prgs-merger
session_id: 24434-acb0a556f8ac
worktree: /Users/jasonwalker/Development/Gitea-Tools/branches/review-pr-592-live-008cd3f
phase: adopted
candidate_head: 008cd3fd74
target_branch: master
target_branch_sha: 683649424b
last_activity: 2026-07-09T21:31:07Z
expires_at: 2026-07-09T23:31:07Z
blocker: none

<!-- mcp-review-lease-adoption:v1 --> adopted_at: 2026-07-09T21:31:07Z adopted_by_identity: sysadmin adopted_by_profile: prgs-merger adopted_from_session_id: 24433-34b72d6a4872 adopted_from_profile: prgs-reviewer adopted_from_reviewer_identity: sysadmin adopted_from_comment_id: 8891 adoption_reason: merger-handoff-approved-head <!-- mcp-review-lease:v1 --> repo: Scaled-Tech-Consulting/Gitea-Tools pr: #592 issue: #590 reviewer_identity: sysadmin profile: prgs-merger session_id: 24434-acb0a556f8ac worktree: /Users/jasonwalker/Development/Gitea-Tools/branches/review-pr-592-live-008cd3f phase: adopted candidate_head: 008cd3fd742c4005ecd94ff4be97e8eb63d526ca target_branch: master target_branch_sha: 683649424b5b6e474007a900847b21579f1835b8 last_activity: 2026-07-09T21:31:07Z expires_at: 2026-07-09T23:31:07Z blocker: none
sysadmin merged commit 7186718cfd into master 2026-07-09 16:32:03 -05:00
Owner

Stale #332 review-decision lock cleanup (#594)

Status: APPLIED

Manual deletion of session-state files is not the workflow.
This path only clears a lock when the referenced PR is merged/closed.

## Stale #332 review-decision lock cleanup (#594) Status: **APPLIED** - actor: `sysadmin` - profile: `prgs-reviewer` - timestamp: `2026-07-09T21:32:36.685278+00:00` - last terminal: `approve` on PR #592 - PR state: `closed` (merged=True) - merge_commit_sha: `7186718cfd482179362b8e4aa3e180f2f97b0831` - prior live_mutations_count: `1` - prior profile_identity: `prgs-reviewer` Manual deletion of session-state files is **not** the workflow. This path only clears a lock when the referenced PR is merged/closed.
Sign in to join this conversation.
No Reviewers
No labels
2 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: Scaled-Tech-Consulting/Gitea-Tools#592