sysadminandClaude Opus 4.8 1301a57de4 docs(governance): MCP restart governance and authorization policy (#656)
Adds docs/architecture/mcp-restart-governance.md, the restart-governance/v1 ADR
defining who may restart the MCP control plane and under what conditions.

- Recovery ladder (reconnect -> rebind -> scoped restart -> full restart -> host)
  with restart stated as the last resort.
- Authorization matrix across author/reviewer/merger/reconciler/controller/
  operator/admin; no LLM worker role may perform or authorize a full or host
  restart.
- v1 authority decision recorded: controller approval + automated safety gates;
  quorum deferred to a superseding ADR.
- Break-glass path with pre-declared incident and mandatory post-hoc audit.
- Ambiguous policy state denies restart.
- Stable policy IDs RG-01..RG-08 for later enforcement code to bind to.

Cross-links the ADR from docs/safety-model.md and docs/webui-deployment.md, and
adds tests/test_mcp_restart_governance_docs.py asserting acceptance criteria 1-5.

Co-Authored-By: Claude Opus 4.8 (1M context) <[email protected]>
2026-07-23 19:16:28 -04:00

11 KiB
Raw Blame History

ADR: MCP restart governance and authorization policy

  • Status: Accepted (policy effective immediately for LLM and operator sessions; enforcement tooling may lag)
  • Date: 2026-07-23
  • Tracking issue: #656
  • Policy version: restart-governance/v1
  • Related:
    • Umbrella: #655 — MCP restart / health hardening umbrella
    • Vision: #652 — control-plane restart vision
    • Roadmap: #653 — restart hardening roadmap
    • Coordinator: #630 — forbids process-kill recovery
    • Break-glass / console approval: #642
    • Transport recovery: #591, #584 — EOF / transport-flap self-recovery
    • Stable-control runtime split: docs/architecture/mcp-stable-control-runtime-policy-adr.md (#615)
    • Client-namespace health: docs/mcp-namespace-health.md (#543)
    • Reconnect-only EOF recovery: docs/mcp-namespace-eof-recovery.md

1. Context

The Gitea MCP server is the control plane for real issue and PR mutations (create, comment, lock, review, merge, reconcile). The same process serves every role namespace (gitea-author, gitea-reviewer, gitea-merger, gitea-reconciler, gitea-controller) and holds the in-memory capability-gate code loaded at startup.

Restarting that process is destructive to concurrent work:

  • It resets every session's identity, preflight, and capability-lease binding.
  • It can interrupt a mutation mid-critical-section (a lock acquire, a review submit, a merge), leaving durable state half-written.
  • Relaunching from the wrong checkout or worktree silently changes which code the control plane runs, defeating master-parity gates (#420 / #615).

Today there is no durable written policy stating who may restart MCP, under what conditions, that restart is a last resort, and how controller approval, automated safety gates, and break-glass interact. Operators and LLM sessions therefore invent restart behavior ad hoc, which makes concurrent multi-role work unsafe. #630 and #642 need this policy as their backbone.

This ADR defines that policy. It does not implement coordinator code or HA multi-instance restart (those are later children of #655).

2. Decision

2.1 v1 decision (recorded)

Restart authority in v1 is controller approval + automated safety gates.

A restart of the stable control runtime is authorized only when both hold:

  1. A controller role explicitly approves the restart, recording an audit entry (who, why, scope, affected sessions), and
  2. The automated safety gates pass: a completed drain acknowledgement (no affected session is mid-critical-section) or a declared break-glass incident (§2.5).

Quorum among multiple controllers is not required day-one. It is deferred unless a later investigation (tracked under #653) proves single-controller approval is insufficient. This ADR records the v1 decision so enforcement code (#630) has a fixed target; changing it requires a superseding ADR.

2.2 Restart is a last resort — the recovery ladder

Restart is the last rung. Before any restart, exhaust the narrower recoveries, in order:

  1. Reconnect the IDE/client MCP namespace (transport EOF, client is closing: EOF, transient #584 flap). No process change. See docs/mcp-namespace-eof-recovery.md.
  2. Refresh / rebind the session workspace: re-run gitea_whoami, gitea_resolve_task_capability, and pass an explicit validated worktree_path. Fixes stale session context without touching the process.
  3. Scoped restart of a single misbehaving namespace/service (where the deployment supports per-service restart) rather than the whole control plane.
  4. Full restart of the stable control runtime process — operator-owned, controller-approved, drained.
  5. Host / infrastructure restart — the broadest action; same authorization as a full restart plus infrastructure ownership.

A session must try rungs 12 and record why they were insufficient before requesting a restart at rung 3 or above. Skipping straight to restart is a policy violation.

2.3 Authorization matrix

Role Reconnect (1) Refresh/rebind (2) Scoped restart (3) Full restart (4) Host restart (5)
author self self request only forbidden forbidden
reviewer self self request only forbidden forbidden
merger self self request only forbidden forbidden
reconciler self self request only forbidden forbidden
controller self self approve (+gates) approve (+gates) request to operator
operator self self execute (controller-approved) execute (controller-approved) execute (controller-approved)
admin self self execute execute execute (break-glass)

Legend: self = may perform for its own client session; request only = may raise a restart request but not authorize or execute it; approve = may authorize under §2.1 gates; execute = may perform the process action after the authorization is recorded.

Key invariants:

  • No LLM worker role (author/reviewer/merger/reconciler) may perform or authorize a full or host restart. They may only reconnect/rebind their own client and file a restart request.
  • Controller approval authorizes; operator/admin executes. The approving controller and the executing operator may be the same human, but both the approval and the execution are audited.
  • Privileged process actions (full restart, host restart) are reserved to operator/admin, never to an automated worker.

2.4 Approved conditions

A restart at rung 3+ is approved only under one of these recorded conditions:

  • No affected sessions: the control plane has no live session that would be interrupted (verified, not assumed).
  • Full drain acknowledged: every affected session has drained (no open critical section — no held mutation lease mid-write) and the drain is acknowledged in the audit record.
  • Controller + gates: controller approval plus passing automated safety gates (§2.1), the standard v1 path.
  • Quorum: not required in v1; reserved for a future superseding ADR.
  • Break-glass: an incident-backed emergency exception (§2.5).

Restart never bypasses mutation gates mid-critical-section. Drain before restart is mandatory except under break-glass with a declared incident.

2.5 Break-glass

Break-glass is a separate, narrower authorization path for emergencies where the normal drain-and-approve path cannot complete (e.g. the control plane is wedged and cannot drain).

Break-glass conditions:

  • A declared incident record exists (id, timestamp, declarer) before the action.
  • The action is taken by operator or admin authority only — never by an LLM worker role, and never unilaterally by an operator with active peers when a controller is reachable.
  • The scope is the minimum necessary rung of the ladder.
  • A mandatory post-hoc audit entry is filed: what was restarted, why the normal path was impossible, which sessions were affected, and the incident id.

Break-glass suspends the drain requirement, not the audit requirement.

2.6 Explicit prohibitions

  • A unilateral LLM or operator full restart while active peer sessions exist is forbidden. An LLM worker role must not kill, restart, or relaunch the MCP process; a lone operator must not full-restart over live peer work without controller approval or a break-glass incident.
  • Process-kill recovery is forbidden as a routine tool (#630). This ADR does not introduce a kill path.
  • Ambiguous policy state denies restart (§4).

3. Security requirements

  • Full restart and host restart are privileged; only operator/admin execute them, only after a controller approval or break-glass incident is recorded.
  • Break-glass is a distinct authorization path with its own audit mandate; it is never the default and never silent.
  • Every approval and every restart action is audited (who approved, who executed, scope, affected sessions, condition, policy version). No restart is authorized without a durable audit entry.

4. Failure behavior

Ambiguous policy → deny restart. If it cannot be established that a restart is authorized under §2 — unknown affected-session state, missing controller approval, absent break-glass incident, or an unclassifiable request — the safe action is to refuse the restart and stop with a recovery report, never to restart on assumption.

5. Policy IDs (for enforcement code)

Enforcement code (#630 coordinator, #642 console approval) binds to these stable policy identifiers rather than to prose:

Policy ID Statement
RG-01 Restart is last resort; rungs 12 must be tried and recorded first (§2.2).
RG-02 v1 authority = controller approval + automated safety gates (§2.1).
RG-03 No LLM worker role performs or authorizes full/host restart (§2.3).
RG-04 Full/host restart executed by operator/admin only, post approval (§2.3).
RG-05 Drain before restart is mandatory except break-glass with incident (§2.4).
RG-06 Break-glass requires a pre-declared incident and post-hoc audit (§2.5).
RG-07 Unilateral LLM/operator full restart with active peers is forbidden (§2.6).
RG-08 Ambiguous policy state denies restart (§4).

The restart-governance/v1 policy version field is emitted on future restart audit events so approvals can be reconciled against the policy revision in force.

6. Dogfooding

Gitea-Tools governs its own MCP control plane by this policy. Author, reviewer, merger, and reconciler sessions operating on this repository use the recovery ladder (§2.2) — reconnect and rebind, never self-restart — and any real restart of the Gitea-Tools stable control runtime follows the controller-approval + drain path defined here.

This ADR is the authoritative restart-governance policy. It must stay cross-linked from the safety model and the web-console deployment boundary:

  • docs/safety-model.md § Process restart governance references this ADR.
  • docs/webui-deployment.md references this ADR for restart/reload disposition.

It is linked to its issue lineage — umbrella #655, vision #652, roadmap #653, coordinator #630, and break-glass / console approval #642 — in § Related above.

8. Non-goals

  • Implementing the restart coordinator or approval state machine (#630, later children of #655).
  • Implementing HA multi-instance restart or quorum machinery.
  • Introducing any process-kill or auto-restart tool; existing auto-restart behavior must be inventoried before any new restart tool is enabled.