Thin task-oriented completion, release, and reassessment workflow #993
Open
opened 2026-07-31 10:19:14 -05:00 by jcwalker3
·
0 comments
No Branch/Tag Specified
master
fix/issue-987-native-mcp-bootstrap
feat/issue-985-project-scoped-launcher-identity
fix/issue-983-cross-repo-base-ref
feat/issue-980-stale-worker-retirement
fix/issue-975-client-identity-heartbeat
fix/issue-973-cross-repo-canonical-roots
fix/issue-970-safely-resolve-missing-worktrees
fix/issue-969-native-mcp-bootstrap
feat/issue-664-break-glass-restart
feat/issue-708-mcp-namespace-attachment
feat/issue-665-restart-audit
fix/issue-700-durable-walls
fix/issue-704-prevent-env-workspace-bindings
feat/issue-707-cross-project-boundaries
fix/issue-690-review-profile-switch-guard
fix/issue-953-bootstrap-lock-provenance
feat/issue-949-native-fleet-inventory
fix/issue-943-runtime-context-helpers
fix/issue-945-owning-pr-renewal-evidence
fix/issue-941-scope-guard-bootstrap-wiring
docs/issue-930-remote-mcp-coupling-inventory
fix/issue-892-author-bootstrap-deadlock
fix/issue-686-detect-reject-manual-mcp
fix/issue-672-mcp-config-drift
fix/issue-689-deterministic-mcp-namespace
feat/issue-666-concurrent-mcp-restart-tests
feat/issue-659-maintenance-drain-mode
feat/issue-648-notifications-console
fix/issue-670-direct-master-incident
feat/issue-644-console-recovery
feat/issue-650-providers-insights
feat/issue-669-scoped-component-recovery
docs/issue-668-mcp-ha-rolling-restart
feat/issue-667-console-restart-controls
feat/issue-645-linkage-console
feat/issue-643-request-preview-initiate
fix/issue-897-permission-stale-runtime-classification
feat/issue-641-runtime-session-view
feat/issue-663-restart-classes
feat/issue-661-drain-proof-hard-gate
fix/issue-854-semantic-container-exclusion
issue-640
fix/issue-682-starlette-httpx2
v1.1.0
Labels
Clear labels
allocator
anti-stomp
architecture
bug
chore
codex
concurrency
contamination
control-plane
dashboard
database
design
documentation
enhancement
gitea
glitchtip
important
incident
incident-bridge
integration
jenkins
labels
leases
mcp
mcp-health
mcp-menu
multi-project
mutating
nice-to-have
observability
portability
preflight
protected-branch
queue
read-only
reconnect
recovery
refactor
release
reliability
resumable-review
reviewer
roadmap
safety
security
self-hosted
sentry
stale-runtime
status:blocked
status:in-progress
status:pr-open
status:ready
terminal-lock
testing
tracker
type:bug
type:feature
type:feature
type:guardrail
visibility
workflow
workflow-hardening
workflow-hardening
bug
duplicate
enhancement
help wanted
invalid
question
wontfix
Controller-owned work allocator
Prevent concurrent LLM session stomping
Architecture / structural design
OpenAI Codex client / workflow session surface
Concurrent session safety
Workflow or session contamination incident
MCP control-plane coordination and allocation authority
MCP operational dashboard/queue view
Internal coordination storage (SQLite/Postgres)
Design / investigation, no implementation
Docs / runbooks
New feature or improvement
Gitea MCP workflow
GlitchTip integration
Operational or process incident requiring durable audit trail
Sentry-to-Gitea incident bridging
Integration testing
Jenkins integration
Label taxonomy management
Lease adopt/release/expire lifecycle
MCP server / tooling
MCP namespace and runtime health
MCP menu surface
Work spanning multiple monitoring projects or Gitea repos
Mutating action; requires gating
Observability, metrics, traces, error reporting
Cross-platform / portability
Shared preflight gates before mutation
Protected branch / stable-branch policy concern
Work queue visibility and allocation
Read-only, no mutation
MCP client reconnect/reload recovery path
Recovery paths for stale/foreign leases
Code refactor / restructure
Release / versioning
Reliability / failure handling
Persist and resume prepared review verdicts across sessions
Reviewer workflow tooling
Roadmap / umbrella issue
Safety rails and fail-closed mutation guards
Security / trust boundary
Self-hosted infrastructure integration
Sentry error monitoring integration
Stale backend daemon / runtime-vs-master parity failures
Issue is blocked
Issue is being worked on
Issue has an open pull request
Issue is ready for work
Terminal review lock (#332) path
Tests / test coverage
Issue tracker hygiene / meta
Bug or defect
Feature or enhancement
Feature or enhancement
Safety gate or guardrail
Workflow state visibility for LLMs/operators
Cross-tool workflow
LLM workflow coordination hardening
LLM workflow coordination hardening
Something is not working
This issue or pull request already exists
New feature
Need some help
Something is wrong
More information is needed
This won't be fixed
No labels
Milestone
No items
No Milestone
Projects
Clear projects
No projects
No Assignees
Notifications
Due Date
No due date set.
Dependencies
No dependencies set.
Reference: Scaled-Tech-Consulting/Gitea-Tools#993
Reference in New Issue
Block a user
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Parent umbrella: issue #989. Informative bootstrap evidence only, not a machine-enforced dependency; Child 1 delivers structured relationships and backfills this.
Problem
Even with a neutral inventory and a safe claim, finishing and releasing a cycle requires traversing many low-level gates in a fragile order. Completion, release, escalation, and reassessment have no coherent surface, and a failed gate can leave the failure recorded nowhere durable.
Charter connection
Bounded work cycle — the smallest unit leaving the project coherent and handoff-ready, completed within a single lease, never spanning multiple leases; if it cannot finish, the worker brings the artifact to a coherent stopping point, records state in Gitea rather than session memory, and releases; continuation is a new task available to any worker. Escalation — record the question on the existing issue or PR, mark blocked-pending-clarification, release, move on; never file a new issue. Approval, parity, and remediation.
Verified current gap
Publish, PR creation, reviewer handoff, and lease retirement are four separate operations with no shared transaction; interruption strands the branch (#891, which itself requires #816). When a gate fails, the closure that stops the mutation also forbids posting the diagnostic handoff (#895). The author work-issue workflow could not be loaded natively (#873). Terminal retirement of author leases is unimplemented (#792).
Scope
A small normal worker surface composing existing safety operations:
Lower-level diagnostic, recovery, administrative, and reconciliation operations remain directly callable.
Non-goals
Creating a monolithic dispatcher. The surface composes; no operation in it selects, ranks, or recommends. Re-owning #891's finalization, #895's failure reporting, #873's workflow loading, #792's retirement, or Child 3's activation lifecycle. Changing exact-head approval semantics. Removing low-level tools. Creating a new issue merely because a worker is confused.
Functional requirements
Safety and authority boundaries
No operation selects work or recommends a next task. Diagnostic, recovery, administrative, and reconciliation tools remain directly reachable; this surface is a composition layer, never a gatekeeper over them.
Acceptance criteria
Required tests and validation
Full-cycle traversal. Lease-boundary enforcement with a deliberate overrun. Escalation path including marker application and a no-new-issue assertion. Failure reporting after a closed gate. Release-and-revoke returning the worker to neutral. Reassess-names-no-substitute assertion. A regression proving approval behaviour is unchanged by this surface. Direct callability of a representative diagnostic, administrative, recovery, and reconciliation tool. Contract tests use deterministic fixtures with nondeterministic values normalized.
Dependencies
Until Child 1 delivers sanctioned structured relationship operations, the references below are informative bootstrap evidence only. They must not be treated as machine-enforced hard dependencies. Child 1 must backfill the appropriate structured relationships.
Hard: Child 3, #891 (which requires #816), #873, #895. Also Child 1 for the marker and release protocol and #792 for retirement. #916 is a pending certification gate for any workflow path that reviews, approves, or merges; it is not silently assumed and is not implemented here.
Compatibility and rollout
Additive; existing tools keep documented fields and typed failure contracts. The dashboard and allocator are untouched here.
Rollback behavior
Removing the surface returns workers to the underlying operations and stops autonomous cycles safely. It never reintroduces role-first entry or allocator selection, and never leaves a claim held without a release path.
Documentation requirements
The worker surface reference. The composition boundary — what is composed versus what stays direct. The bounded-cycle and escalation rules. An explicit statement of the pending #916 dependency.
Completion evidence
A recorded end-to-end cycle, the lease-overrun result, the escalation-path result, and the release-to-neutral result.
Reusable existing issues, PRs, and primitives
#891, #895, #873, #792, #816, #952, #916 (pending). Live primitives: review-workflow loading, file committing, PR creation, review submission, merging, lease release, issue commenting, label setting.
Fundamental-workflow stage supported
work -> release -> reassess — charter steps 6, 9, 10, 11, and 12, plus Bounded work cycle and Escalation.