Commit Graph
5 Commits
Author SHA1 Message Date
sysadmin cb2a5911d9 fix: resolve conflicts for PR #422
Re-merge current prgs/master after #424/#407 landed. Combine workflow-load
boundary session proof (#403/#389) with reviewer PR lease test fixtures
from master so reviewer mutation gates stay fully covered.
2026-07-07 17:39:24 -04:00
sysadminandClaude Opus 4.8 c225632c1e feat: add workflow-load session boundary proof (Closes #403)
Extend the review workflow load gate with pre-review command classification,
boundary violation tracking, and structured helper-result requirements in
final reports. Adds gitea_record_pre_review_command MCP tool.

Co-Authored-By: Claude Opus 4.8 (1M context) <[email protected]>
2026-07-07 17:20:36 -04:00
sysadminandClaude Opus 4.8 06c2069234 feat: add per-PR reviewer leases for parallel review (Closes #407)
Structured PR-thread leases with acquire/heartbeat MCP tools and
mutation-time enforcement so reviewers cannot race the same PR queue.

Co-Authored-By: Claude Opus 4.8 (1M context) <[email protected]>
2026-07-07 17:16:06 -04:00
sysadminandClaude Opus 4.8 71ccbca10f feat: require transient validation failure history in reviewer reports (Closes #396)
Add assess_validation_failure_history_report so reviewer final reports must
document every validation failure observed during a session, not only the
final passing result. Wire the verifier into final_report_validator,
gitea_validate_review_final_report, and the review-merge workflow template.

Co-Authored-By: Claude Opus 4.8 (1M context) <[email protected]>
2026-07-07 11:22:00 -04:00
sysadmin 6200e6bbec docs: split LLM project workflow into task-specific modes (Closes #333)
Consolidate all four canonical workflow files and router SKILL.md:
- review-merge-pr.md (from #334 canonical prompt)
- reconcile-landed-pr.md (reconciliation gates + handoff schema)
- create-issue.md (canonical issue-creation prompt)
- work-issue.md (canonical author/coder prompt)

SKILL.md is now a short router with mode isolation and universal rules.
Adds final-report schemas for all modes and 13 doc-contract tests.

Supersedes partial split work in PR #335; full #333 acceptance in one PR.
2026-07-07 03:44:21 -04:00