Commit Graph
2 Commits
Author SHA1 Message Date
sysadmin d4dc9aa854 fix: align test mocks with #399 lease gates and head SHA requirements
PR #416 introduced pr_work_lease reviewer blocks and mandatory full
40-hex expected_head_sha on mark/merge paths. Update audit, review,
permission-report, terminal hard-stop, inventory, and schema tests to
patch lease comment fetches, seed ready review decisions, and use
consistent HEAD_SHA constants so the full suite passes again.
2026-07-08 01:26:36 -04:00
sysadminandClaude Opus 4.8 456e46d3fc feat: enforce session hard-stop after terminal review mutation (#332)
Extends the single-terminal-decision machinery (#211) to session-level
hard-stop semantics:

- terminal_review_hard_stop_reasons: after a live terminal verdict, only
  the merge sequence for the same approved PR may continue; REQUEST_CHANGES
  stops the run; operator-approved corrections re-open the review path
  only, never a cross-PR merge.
- gitea_merge_pr: new Gate 2b consults the hard-stop before any API call,
  so a run can never verdict one PR and merge another.
- gitea_mark_final_review_decision: hard-stop check with explicit stop
  guidance naming the consumed terminal mutation; plus duplicate
  REQUEST_CHANGES suppression — an unresolved request-changes at the
  current head SHA refuses a second request-changes (fail closed when
  feedback cannot be verified).
- tests/test_terminal_review_hard_stop.py: 13 tests covering the
  acceptance criteria; existing TestSubmitPrReview setups stub the new
  feedback fetch.

Co-Authored-By: Claude Opus 4.8 (1M context) <[email protected]>
2026-07-07 04:32:15 -04:00