fix: close implements tracker gap and clarify closing keywords (#110)

This commit is contained in:
2026-07-02 19:34:45 -04:00
parent 2e2da05eab
commit 0bbbca4223
7 changed files with 27 additions and 6 deletions
+2 -2
View File
@@ -90,8 +90,8 @@ is maintained by:
- the branch name (contains the issue number),
- a claim comment on the issue, e.g.
`Claimed. Branch: fix/issue-123-short-description. Worktree: branches/fix-issue-123-short-description.`,
- the PR body — `Closes #123` when the PR should close the issue, `Refs #123`
when related but not closing,
- the PR body — `Closes #123` or `Fixes #123` when the PR should close the issue
(do NOT use `Implements #123` or `Refs #123` to close, as Gitea will not auto-close),
- cleanup after merge — remove the remote branch, local branch, and the issue
worktree folder, and drop `status:in-progress`.
@@ -19,7 +19,7 @@ Steps:
- Target task role: merger identity (must NOT be the PR author)
*If the current identity does not match the required role (or is the PR author), STOP. Relaunch/switch to the correct profile first.*
2. Verify authenticated identity + active profile.
3. Confirm PR #<pr>: author (not you), state open, mergeable, review approved.
3. Confirm PR #<pr>: author (not you), state open, mergeable, review approved. Check if PR body uses `Closes #N` or `Fixes #N`; if it uses `Implements #N` or `Refs #N`, manual closing will be needed in step 29.
4. If any gate fails → STOP and report.
4. Merge with explicit confirmation (e.g. confirmation="MERGE PR <pr>"),
optionally pinning the reviewed head SHA / changed-file set.
@@ -24,7 +24,7 @@ Steps:
4. scripts/worktree-review <pr-head-branch> # detached, branches/review-*
cd branches/review-<pr-head-branch-slug>
5. Confirm the worktree is clean. Inspect the FULL diff; confirm scope matches
issue #<n>; flag any unrelated files, secrets, or formatting churn.
issue #<n>; flag any unrelated files, secrets, or formatting churn. Check that the PR body correctly uses Gitea-closing keywords (`Closes #N` or `Fixes #N`) instead of non-closing ones (`Implements #N`, `Refs #N`).
6. Run the test suite; note results.
7. Post the review verdict: approve only if scope is clean and checks pass;
otherwise request changes with specifics. Never merge from this review step.
@@ -28,6 +28,7 @@ Steps:
6. Checks: run the test suite, compile/lint changed files, git diff --check,
and scan the diff for secrets.
7. Commit (issue-linked message), push the branch, open a PR to master.
*The PR body MUST use closing keywords like `Closes #N` or `Fixes #N` to close the issue; do NOT use `Implements #N` or `Refs #N` for closing, as Gitea will not auto-close it.*
Include an "LLM Handoff Metadata" block in the PR body (attribution only;
never an eligibility input — docs/llm-agent-sha.md):